Altoona, IA — Blanket Excavation Right Of Way Permit Bond

Altoona's current Engineering page requires a $25,000 contractor blanket Performance & Maintenance Bond for ROW projects. Match its actual template: optional route-design approval is not construction permission, and the form's four-year defect duty is separate from its minimum five-year right-to-sue provision.

Continue to our secure checkout partner, Propeller (opens in a new tab).

Recorded state
Iowa
Bond type
Right-of-Way / Street Work Bond
Category
Contractors & construction

What this bond does

Contractor blanket security for excavation/restoration under City of Altoona, Iowa ROW permits, matched to its required performance/maintenance form.

Who needs it
The actual excavating contractor/principal. A utility provider's separate ROW license or approved route design does not replace contractor security.
Who it protects
The template secures covered permit performance, City restoration and defect correction, with City outlay/expense provisions and its stated limits. It is not an unrestricted guarantee of every private contract or a simple one-year-only promise.

Your bond option

This is the option on record for this bond.

The bond amount describes the limit of the bond obligation, not the price. A listed amount does not establish what the requesting party requires. The premium is what you pay and must be confirmed for the actual option. An E&O limit, where listed, is separate errors and omissions insurance.

Use the contractor blanket form before construction

The current City page lists $25,000 contractor Performance & Maintenance security and separate $1,000,000 liability documentation naming the City additional insured for ROW construction. The actual template is labeled a blanket bond for all projects by the contractor under City ROW permits; identify the proper company/principal and accepted scope.

A utility company may obtain optional route-design approval before bidding, but design approval does not authorize construction. The page also separately requires ROW licenses for non-franchise private utility providers. Arrange the actual construction permit with route/map, contractor details and security rather than treating any one of these approvals as all of them.

Execute the actual template and retain post-work obligations

The linked template requires correction of defects/damage from covered work for four years after completion and disallows limiting the right to sue to less than five years after completion. It also includes broad City outlay/expense provisions and a stated surety ceiling of 125% of the penal sum. These are form conditions, not an offered four- or five-year provider term or automatic release date.

Purchase Now opens Propeller; the option displays no fixed amount or term. Match the actual City form, principal/recipient, required sum, covered work and dates with the issuer. The template calls for quadruplicate execution, original ink signatures rather than copies/facsimiles, raised surety seal and valid sealed power of attorney with matching attorney-in-fact details.

Use the City's Engineering permit portal for its actual application process, but arrange accepted original execution/delivery with Engineering rather than assuming an upload replaces the template's requirements. Obtain actual construction approval and follow completion/inspection, defect correction and release or continuation directions.

Sources

Have these ready

  1. Actual excavating contractor/principal and covered City ROW projects/route map.
  2. City $25,000 blanket performance/maintenance template and separate liability documentation; distinguish utility license/design.
  3. Issuer match, actual dates, quadruplicate ink execution, seals/power of attorney and Engineering-accepted delivery.
  4. Separate construction approval, completion/inspection and actual post-work defect/claim/continuation or release conditions.

Questions about this bond

Does an approved design permit allow construction?

No. The current City page explicitly separates optional route design from the required construction permit, contractor bond and insurance.

Do four- and five-year clauses mean an annual bond has ended the obligation?

No. The template separately addresses four-year defects and a minimum five-year right to sue after completion. Match actual issued conditions; no fixed provider term is displayed.

Does applying online remove original-signature requirements?

Do not assume that. The linked template asks for original ink execution, seals and power of attorney. Arrange the actual accepted originals/delivery with Engineering.