Aspen, CO — Maintenance - Multiple Occurrence Work Bond (2 Years)

The Aspen, CO Maintenance - Multiple Occurrence Work Bond is a surety instrument required for contractors performing work within public rights-of-way, public easements, or public grounds in the City of Aspen. This bond provides financial security to the City of Aspen, ensuring that the work performed meets municipal quality standards and that the contractor repairs any defects that arise during the two-year maintenance period.

Term
2 years

Continue to our secure checkout partner, Propeller (opens in a new tab).

Recorded state
Colorado
Bond type
Performance, Payment, Maintenance & Site Improvement Bond
Category
Contractors & construction

What this bond does

This bond guarantees that the contractor will perform all work according to the City of Aspen's specifications and requirements. It serves to protect the city from damages or losses resulting from the contractor’s activities, including negligence, misconduct, or the use of improper equipment or materials during the permitted work.

Who needs it
Contractors and construction firms performing multiple work projects within the City of Aspen who are required to obtain a Right-Of-Way permit for disturbing public ground.
Who it protects
The City of Aspen, Colorado, acts as the obligee of this bond. The bond covers the cost of repairing or replacing any defects in workmanship or materials for a duration of two years following the date the Engineering Department issues a final Inspection Log verifying 100% satisfactory completion.

Your bond option

This is the option on record for this bond.

The bond amount describes the limit of the bond obligation, not the price. A listed amount does not establish what the requesting party requires. The premium is what you pay and must be confirmed for the actual option. An E&O limit, where listed, is separate errors and omissions insurance.

Understanding the Bond Obligation

This bond is specifically structured to cover multiple occurrences of work under a single coverage term. It ensures that the project remains free from defects and is maintained in a condition satisfactory to the City of Aspen’s governing body for two full years after the final inspection. The bond is non-cancelable for this two-year duration, providing continuous protection to the city.

The penal sum of the bond is defined as the greater of $2,500 or the total value of the work performed. By securing this bond, the contractor accepts liability for potential damages to life or property resulting from their operations, including those caused by agents or employees, and agrees to indemnify the city against such losses.

Permit Requirements and Compliance

To satisfy the requirements for a Right-Of-Way permit in Aspen, applicants must demonstrate their ability to complete work in accordance with the detailed plans and specifications established by the City of Aspen Engineering Department. This includes providing proof of the required surety bond that covers the specific project type, such as the Multiple Occurrence Work category.

Contractors are responsible for ensuring that all equipment, labor, and materials used in the permitted work are of sufficient character and quality to meet local municipal standards. Failure to meet these obligations or to rectify defects identified during the two-year maintenance period may result in claims against the bond to recover the costs associated with necessary repairs or remediation.

Bond Issuance and Execution

The bond must be executed by a surety corporation qualified to transact business in the State of Colorado. The principal and the surety must be clearly identified, and the document must be signed by the contractor and the surety's attorney-in-fact to be considered valid for permit submission.

Once the bond is secured and the work is completed, the two-year maintenance window officially begins upon the issuance of the final Inspection Log by the city. Contractors should coordinate with the Engineering Department to ensure all documentation is properly filed before commencing work in the public right-of-way.

Sources

Have these ready

  1. Verify the total value of your work to determine the required bond penal sum, ensuring it is at least $2,500.
  2. Obtain the specific bond form required by the Aspen Engineering Department for Multiple Occurrence Work.
  3. Ensure your surety company is licensed to operate within the State of Colorado.
  4. Compile detailed plans and specifications for your proposed work to present to the Engineering Department.
  5. Prepare to have the bond form signed by your business officer and your surety's authorized attorney-in-fact.

Questions about this bond

What is the term length of this bond?

The bond remains in effect for a two-year maintenance period that commences upon the issuance of the final Inspection Log indicating 100% satisfactory completion of the work.

Can I cancel this bond if I finish my work early?

No. The bond is specified as non-cancelable for the full two-year term following the issuance date.

What happens if a defect is found during the maintenance period?

The contractor is responsible for repairing or replacing all defects to the satisfaction of the City of Aspen during the two-year maintenance period.

Is this bond only for a single project?

The Aspen maintenance bond options include Single project, Multiple Occurrence Work, and Blanket Coverage; you must ensure the bond is designated for Multiple Occurrence Work when applying.