Bismarck, ND — Excavation Bond
Bismarck's excavation procedures call for a $25,000 License/Permit Bond and a two-year site-repair guarantee. Have the contractor identity and Engineering Department request ready, then use Purchase Now to apply.
Continue to our secure checkout partner, Propeller (opens in a new tab).
- Recorded state
- North Dakota
- Bond type
- Building / Excavation / Grading Permit Bond
- Category
- Contractors & construction
- Local scope
- City
What this bond does
The city's bonding requirements address excavation costs, loss and damage, plus keeping the site in repair for two years from completion. If required restoration or maintenance is not performed, the city may complete the work and recover its costs from the bond or defaulting party.
- Who needs it
- The contractor seeking approval to perform covered excavation in Bismarck's public right of way. The city separately describes permits for certain private-property sewer and water work connected to its utilities; check applicability for the actual location.
- Who it protects
- The city receives excavation security, with required wording 'in accordance with City of Bismarck Ordinances.' Contractor licensing, professional qualifications, insurance and the excavation permit remain separate requirements.
Your bond option
This is the option on record for this bond.
- Bond optionPurchase Now (opens in a new tab)Continue to our secure checkout partner, Propeller (opens in a new tab).
The bond amount describes the limit of the bond obligation, not the price. A listed amount does not establish what the requesting party requires. The premium is what you pay and must be confirmed for the actual option. An E&O limit, where listed, is separate errors and omissions insurance.
Sources
Have these ready
- Have the legal contractor identity, state license and applicable trade information.
- Obtain the city's accepted License/Permit Bond form, $25,000 sum and effective-date request.
- Keep the excavation address, legal description, utility service and permit information ready.
- Separate insurance, traffic plans and city contractor approval from issuance of the bond.
Questions about this bond
Does the bond replace an excavation permit?
No. The procedures separately require permits before covered boring or excavation, including specified work connected to city utilities. Match the project to Engineering's instructions.
Is the repair guarantee the provider's checkout term?
Not necessarily. The city's two-year site-repair obligation is measured from completion. Do not convert it into a guessed provider term or automatic release date.
How do I apply?
Purchase Now opens Propeller in a new tab. Check the contractor, city recipient, required ordinance wording, form and sum. After issuance, complete execution and submit the bond; city approval and work permission follow their separate process.

