Blue Ash, OH — Work In Right Of Way (Main Arterial Streets - ) Bond
Blue Ash lists a $5,000 right-of-way work bond for designated main arterial streets. Check the particular street and segment with Public Works rather than using the other-streets or downtown category based on the bond amount alone.
Continue to our secure checkout partner, Propeller (opens in a new tab).
- Recorded state
- Ohio
- Bond type
- Right-of-Way / Street Work Bond
- Category
- Contractors & construction
What this bond does
Provide the City-requested work security for a job in Blue Ash's designated main-arterial right-of-way category.
- Who needs it
- Contractors whose Blue Ash right-of-way work is assigned to the City's main-arterial bond category.
- Who it protects
- The security supports the City's permitted work and restoration obligation. The applicant remains responsible for operations, repairs and required inspections; issuance is not the City's permission to occupy or excavate the road.
Your bond option
This is the option on record for this bond.
- Bond optionPurchase Now (opens in a new tab)Continue to our secure checkout partner, Propeller (opens in a new tab).
The bond amount describes the limit of the bond obligation, not the price. A listed amount does not establish what the requesting party requires. The premium is what you pay and must be confirmed for the actual option. An E&O limit, where listed, is separate errors and omissions insurance.
Sources
- Blue Ash Public Works right-of-way requirements (opens in a new tab)Checked October 23, 2026
- Blue Ash Permit to Work in the Public Right of Way, March 2022 (opens in a new tab)Checked October 23, 2026
Have these ready
- Confirm the named arterial and exact work segment with Public Works.
- Obtain the accepted form and confirm the $5,000 requirement for this applicant and activity.
- Prepare the individual signed work application, plan/sketch and proposed dates.
- Match the issued bond and complete City filing, permit approval and inspection arrangements.
Questions about this bond
Does the Plainfield Road category cover every segment?
The City's bond listing specifies Plainfield between Cooper and Reed Hartman. Confirm the actual work limits with Public Works rather than extending that description to the entire road.
Is this interchangeable with the downtown entry because both list $5,000?
Do not select on amount alone. The City names downtown and main arterials as distinct categories. Match the location and instrument to the written request.
Will one arterial bond approve several projects?
No automatic multi-project authorization is established. The City has a separate blanket arrangement, and each job or area still needs its own work permit.
Is the bond period the same as the repair warranty?
Not necessarily. The published bond guidance uses estimated completion or an umbrella end date, while the work application describes a repair warranty from completion. Have the City confirm the dates.