Blue Mound, TX — Right Of Way Permit Bond
Blue Mound's right-of-way work rules call for a $2,500 bond for covered contractors, along with city licensing and a permit for the specific work. Its two-year maintenance obligation runs from completion and city acceptance, not simply from the day you buy a bond.
Continue to our secure checkout partner, Propeller (opens in a new tab).
- Recorded state
- Texas
- Bond type
- Right-of-Way / Street Work Bond
- Category
- Contractors & construction
What this bond does
Provides the security required by Blue Mound Code §3.07.001 for covered work in city streets, alleys, public utility areas and other listed public places.
- Who needs it
- Applicants doing covered street, utility-main or related right-of-way work in Blue Mound who must provide the city with a contractor bond.
- Who it protects
- The code conditions the bond on protecting the city from negligence-related damage and imperfect or inadequate work, and on maintaining the work for two years after completion and acceptance.
Your bond option
This is the option on record for this bond.
- Bond optionPurchase Now (opens in a new tab)Continue to our secure checkout partner, Propeller (opens in a new tab).
The bond amount describes the limit of the bond obligation, not the price. A listed amount does not establish what the requesting party requires. The premium is what you pay and must be confirmed for the actual option. An E&O limit, where listed, is separate errors and omissions insurance.
Sources
- City of Blue Mound — Article 3.07, Streets and Sidewalks (opens in a new tab)Checked October 23, 2026
- City of Blue Mound — Contractor Registration Application (opens in a new tab)Checked October 23, 2026
Have these ready
- Confirm that §3.07.001 covers the proposed work and ask about applicable exceptions.
- Prepare the applicant's legal name, business address and qualifications.
- Request the city-required $2,500 wording and clarify maintenance dates from city acceptance.
- Arrange the separate insurance and obtain the work permit before starting.
Questions about this bond
How much is the Blue Mound ROW bond?
Section 3.07.001 and the city's contractor form state $2,500. Confirm the current city request and issued document before filing.
When does the two-year maintenance period begin?
The code measures it from completion and acceptance by the city. It is not described as two years from purchase.
Does the bond replace my work permit or insurance?
No. The city rules separately address licensing, the permit for the specific work and liability insurance.
Is every sidewalk repair covered by this requirement?
The code expressly exempts repair or replacement of sidewalks or driveway approaches from this section. Have the city confirm the classification of the proposed work.

