Columbia County, GA — Erosion Control Performance Bond

Columbia County's environmental bond paperwork ties the principal to the Notice of Intent or land-disturbance application. Gather that project identity and the Stormwater Compliance Department's security request, then use Purchase Now to apply.

Continue to our secure checkout partner, Propeller (opens in a new tab).

Recorded state
Georgia
Bond type
Grading, Erosion & Stormwater Bond
Category
Contractors & construction

What this bond does

The county's published template addresses failure to meet the land-disturbance permit's erosion, sedimentation and pollution-control conditions. It provides security for stabilizing the site and bringing it into compliance, not a general contractor license.

Who needs it
The company or other principal named in the county's project request. Its April 2025 administrative form says the principal must match the Notice of Intent and/or land-disturbance permit application.
Who it protects
The template names the Board of Commissioners of Columbia County. The administration form separately addresses eligible security instruments and a possible exception where the county already has performance and maintenance security for the same improvements and permit conditions. Do not assume a second bond is always necessary.

Your bond option

This is the option on record for this bond.

The bond amount describes the limit of the bond obligation, not the price. A listed amount does not establish what the requesting party requires. The premium is what you pay and must be confirmed for the actual option. An E&O limit, where listed, is separate errors and omissions insurance.

Check the project, acreage and existing security

The administrative form uses disturbed acreage, with its stated rounding instructions, to calculate erosion-control security. Its quoted code provision sets a ceiling of $3,000 per acre or fraction. Have the department confirm the actual sum rather than calculating from total parcel acreage.

The owner or authorized representative signs the administrative certification. The published instructions call for the completed form and original bond to be mailed or dropped off. Release depends on approved final stabilization and the county's applicable completion conditions; permit issuance alone is not a release or a provider term.

Sources

Have these ready

  1. Have the project/phase, parcel number and disturbed acreage.
  2. Match the principal exactly to the NOI and land-disturbance application.
  3. Collect the county's accepted security instrument, form, amount and dates.
  4. Identify any existing performance/maintenance security for the same improvements before assuming another instrument is needed.

Questions about this bond

Should the principal match the contractor's trade name?

Use the county's request. Its administrative form requires a match to the Notice of Intent and/or land-disturbance application and requests company registration information where applicable.

Does every project need duplicate erosion security?

The administrative form describes an exception involving performance and maintenance security for the same improvements and permit conditions. Obtain the department's determination; do not assume that any existing bond qualifies.

Where do I apply?

Purchase Now opens Propeller in a new tab. Match the principal, county recipient, project/phase, accepted form, amount and dates. Execution and county filing follow issuance; the application does not issue the permit or obtain release.