Ask Columbia Engineering to identify the actual right-of-way bond condition and amount. The city distinguishes utility, temporary and permanent encroachments, and state-maintained roads can require a separate SCDOT approval.

Continue to our secure checkout partner, Propeller (opens in a new tab).

Recorded state
South Carolina
Bond type
Right-of-Way / Street Work Bond
Category
Contractors & construction

What this bond does

Arrange accepted City of Columbia security for the applicable right-of-way encroachment request.

Who needs it
Permit applicants whose utility installation or other encroachment has a written city surety requirement.
Who it protects
The accepted bond condition determines the city’s protection. Permit indemnity, restoration security and an optional insurance-substitute indemnity bond are different obligations, not interchangeable sums for this offering.

Your bond option

This is the option on record for this bond.

The bond amount describes the limit of the bond obligation, not the price. A listed amount does not establish what the requesting party requires. The premium is what you pay and must be confirmed for the actual option. An E&O limit, where listed, is separate errors and omissions insurance.

Identify the correct encroachment review

The city assigns utility encroachments to Engineering and distinguishes temporary work from permanent encroachments. Approval of a permanent installation does not remove the need for temporary permission to perform the installation.

Many roads within the city are state-maintained. The city says both city and SCDOT applications must be approved before work where the state right-of-way is involved. A city address alone does not settle the required recipient.

Get the completed security requirement

Engineering’s published packet includes a bond field in the permit’s special provisions, while its completion report refers to release of $5,000 security after affected departments agree the conditions are met. The uncompleted permit field is not proof that no security is required.

Ask Engineering for the actual condition and sum for your request. Do not substitute the packet’s much larger insurance-alternative indemnity bond or apply SCDOT’s separate calculation automatically. This option supplies no fixed amount or term.

Keep acceptance and closeout separate

Prepare the applicant, work description and method, sketch/drawings, permit reference and required dates. Have the provider verify the city-requested instrument before purchase, then submit the executed security as directed.

The Engineering permit requires written acceptance by the permittee. Its packet also calls for pre/post-construction photographs and a completion inspection report within 30 days, with departmental agreement before release. That report deadline is not a 30-day bond term.

Sources

Have these ready

  1. Engineering’s completed written condition/amount and correct city/SCDOT authority.
  2. Applicant, work method, location, plans and permit reference.
  3. Required dates, execution/Treasurer-filing instructions and completion-report requirements.

Questions about this bond

Does the packet’s uncompleted bond field mean no bond is needed?

No. Ask Engineering for the actual completed security requirement before ordering.

Is the insurance-alternative indemnity bond the same as opening security?

Do not assume so. The packet describes different obligations; match the exact requested condition.

Does filing the completion report automatically release security?

The report describes departmental agreement that all conditions are met. Submission alone is not unconditional release.