East Point, GA — General Contractors Code Compliance Bond
East Point's posted General Contractors form is $25,000 and continuous. It includes a statement about construction not starting before the bond takes effect, so resolve the start date and city request before applying through RLI.
Also known as East Contractor Bonds
Continue to our secure checkout partner, RLI (opens in a new tab).
- Recorded state
- Georgia
- Bond type
- Contractor License / Registration Bond
- Category
- Contractors & construction
What this bond does
Prepare East Point's requested general-contractor code-compliance instrument, not the city's separate Tradesmen form.
- Who needs it
- Contractors whose East Point instructions call for the General Contractors Code Compliance Bond.
- Who it protects
- The form addresses building and other city-code compliance and correction of covered violations during construction and for one year after final inspection, with stated exceptions. It is not a general warranty against all building problems.
Your bond option
This is the option on record for this bond.
- Bond optionPurchase Now (opens in a new tab)Continue to our secure checkout partner, RLI (opens in a new tab).
The bond amount describes the limit of the bond obligation, not the price. A listed amount does not establish what the requesting party requires. The premium is what you pay and must be confirmed for the actual option. An E&O limit, where listed, is separate errors and omissions insurance.
Sources
- East Point — General Contractors Bond Form (opens in a new tab)Checked October 22, 2026
- East Point — separate Tradesmen Bond Form (opens in a new tab)Checked October 22, 2026
Have these ready
- Have the city's General Contractors request and form.
- Prepare the principal's exact identity and address.
- Resolve the effective date and any already-started work with the city.
- Match $25,000 and continuous wording, not the correction-period length.
- Check execution and delivery after issuance.
Questions about this bond
Is the one-year correction period the bond term?
No. The posted form says it is continuous. Its code-correction period runs through one year after final inspection, subject to the form's exceptions.
Can the $10,000 Tradesmen form be used for this request?
Not merely because both involve city code compliance. East Point posts a separate $25,000 General Contractors form; use the city's classification and accepted instrument.
What if construction has already started?
Raise that with the city before arranging dates. The posted form contains a principal warranty about work not occurring before enactment; do not assume provider issuance cures that issue.