East Ridge, TN — Street Obstruction And Excavation Bond
East Ridge’s published street-cut packet includes a $25,000 Street Obstruction and Excavation Bond with a 24-month period beginning on the entered date. Match that form to the city’s actual request before ordering.
Continue to our secure checkout partner, Propeller (opens in a new tab).
- Recorded state
- Tennessee
- Bond type
- Right-of-Way / Street Work Bond
- Category
- Contractors & construction
What this bond does
Provide City of East Ridge security for the permitted street/sidewalk excavation, repair or occupation described in the city condition.
- Who needs it
- Contractors requesting East Ridge street-cut or related excavation/obstruction permission.
- Who it protects
- The city form addresses restoration and indemnifying East Ridge for covered loss, damage or injury arising from the work. It does not replace the permit, separate insurance or traffic-control approval.
Your bond option
This is the option on record for this bond.
- Bond optionPurchase Now (opens in a new tab)Continue to our secure checkout partner, Propeller (opens in a new tab).
The bond amount describes the limit of the bond obligation, not the price. A listed amount does not establish what the requesting party requires. The premium is what you pay and must be confirmed for the actual option. An E&O limit, where listed, is separate errors and omissions insurance.
Sources
Have these ready
- City-requested form, contractor legal name and property-address permit.
- Opening dimensions/sketch, nearest intersection, work dates and closure/emergency details.
- Accepted $25,000/24-month condition, execution/filing, inspection and closeout instructions.
Questions about this bond
Does the cash-deposit schedule establish the bond amount?
No. The packet’s separate surety form prints $25,000. Match the actual requested instrument.
Can one permit automatically cover every address?
The packet requires a separate permit for each property address.
Does the 24-month form eliminate every later repair duty?
Do not assume so. The packet separately discusses maintenance and broader continuing repair liability. Confirm the condition and closeout.

