Skip to content

Georgia bonds

Georgia — Right Of Way Performance Bond

A Georgia ROW performance request needs the actual road authority, permitted work, and accepted security form. This offering's statewide name does not identify every local or State ROW obligation.

Continue to our secure checkout partner, Propeller (opens in a new tab).

Recorded state
Georgia
Bond type
Right-of-Way / Street Work Bond
Category
Contractors & construction

What this bond does

Help a permit applicant match a defined Georgia ROW performance obligation rather than assume one general license bond covers all street work.

Who needs it
The legal applicant or developer named in the particular ROW security request.
Who it protects
The accepted instrument defines the performance and restoration duties and recipient. GDOT's published driveway/encroachment procedure is useful context only when that is the actual requesting process.

Your bond option

This is the option on record for this bond.

The bond amount describes the limit of the bond obligation, not the price. A listed amount does not establish what the requesting party requires. The premium is what you pay and must be confirmed for the actual option. An E&O limit, where listed, is separate errors and omissions insurance.

Confirm the covered permits before choosing security

For GDOT driveway and encroachment work, the published procedure permits blanket performance security based on construction estimates and anticipated statewide permits during its active period. It requires the permit applicant or qualifying developer to be named. That does not establish blanket scope for this provider offering or mean a County road is covered. Bring the actual request and confirm single-project versus multiple-permit coverage.

Use the assigned sum and actual release conditions

GDOT's procedure varies security by the proposed work and Department estimates, including turn lanes and signals. Do not treat a table entry as a universal Georgia minimum. The one Propeller option displays no fixed amount or term. Obtain the accepted form, recipient, required sum, dates, and filing instructions, then use Purchase Now to open the provider. Issuance is separate from permit authorization; for GDOT's process, satisfactory inspection and acceptance precede release.

Sources

Have these ready

  1. Actual State/local road authority, work site, permit and approved scope.
  2. Legal applicant/developer, recipient, accepted bond form, and covered permit(s).
  3. Required security calculation, dates, and any approved blanket arrangement.
  4. Filing, work authorization, inspection, correction/restoration, and release.

Questions about this bond

Does the Georgia label establish statewide blanket coverage?

No. GDOT discusses blanket arrangements within its own process, but the accepted instrument must specify the actual coverage. No blanket provider variant is added here.

Can a GDOT table amount be used for any County ROW request?

No. Match the requesting authority and its work-specific sum; GDOT's construction-based procedure is not proof of a County requirement.

Is this interchangeable with the separate Highway Permit offering?

Equivalence is not established by similar names. Match the principal, recipient, form, scope, sum, and dates of the actual request.

Related bonds

Keep exploring

How can we help you get started?

Choose the quote that fits, and we’ll take it from there.

Have a question? Contact us