Gilroy, CA — Encroachment Permit Bond

Gilroy's encroachment permit documents call for security tied to the permitted work. Have the city's construction estimate and bond request ready, then begin the application through The Southern Agency's existing purchase link.

Continue to our secure checkout partner, Propeller (opens in a new tab).

Recorded state
California
Bond type
Right-of-Way / Street Work / Encroachment Bond
Category
Contractors & construction

What this bond does

This offering identifies Gilroy encroachment permit security for work affecting public streets or utility easements. The city's general conditions describe a performance bond for the work authorized by the permit and its conditions of approval.

Who needs it
A Gilroy encroachment permit applicant furnishing the security requested for the proposed work.
Who it protects
Gilroy's general conditions tie the bond to performance of the permitted work and approval conditions. They also assign restoration duties to the permittee. This does not make the bond a general guarantee of every private construction contract or payment obligation.

Your bond option

This is the option on record for this bond.

The bond amount describes the limit of the bond obligation, not the price. A listed amount does not establish what the requesting party requires. The premium is what you pay and must be confirmed for the actual option. An E&O limit, where listed, is separate errors and omissions insurance.

Use the amount for the actual encroachment

The city's June 2023 submittal requirements call for a performance bond or cash deposit equal to the construction estimate, with a $5,000 minimum. They describe a possible City Engineer waiver where the proposed work does not impact city right-of-way.

The general conditions separately identify $25,000 security for replacement of an existing utility or street-light pole, alongside commitments concerning removal of the old pole. That is a particular pole-replacement condition, not the amount for every encroachment permit. Ask Engineering to confirm the amount and instrument for your scope.

The permit package and issued bond travel separately

The submittal requirements describe an electronic bond copy with the electronic permit package and a hard copy mailed to the city's Engineering Division upon permit approval. Follow the current directions supplied with your application.

Purchase Now opens Propeller in a new tab. The option here does not display a fixed amount or term. Check the issued bond before sending it, and retain the city's separate insurance, plans, traffic-control, and inspection requirements. Buying the bond does not issue the permit.

Sources

Have these ready

  1. The Gilroy permit application and current Engineering bond request.
  2. The construction-cost estimate and any pole-replacement conditions.
  3. The legal permittee, required recipient wording, form, and effective dates.
  4. The work location, improvement or restoration plans, and separate insurance documents.

Questions about this bond

Is $25,000 the amount for every Gilroy permit?

No. The general conditions attach that figure to a specific existing-pole replacement situation. The submittal guide describes estimate-based security for general applications. Confirm the amount for your work with Engineering.

Does a cash-deposit alternative create another checkout option?

No. The city's published alternative belongs to its permit process. This page retains one surety application route; any cash-deposit arrangement is made with the city.

Does the city's workmanship warranty establish this bond's term?

No fixed term is displayed here. Permit warranty and inspection duties do not by themselves establish the duration or release conditions of the issued bond.