Kentwood, MI — Stormwater Management Bond
Kentwood's published stormwater performance form follows the final drainage-facility plans approved by the City Engineer. It calls for professional-engineer as-built certification and Engineering Department approval—not just the end of excavation.
Continue to our secure checkout partner, Propeller (opens in a new tab).
- Recorded state
- Michigan
- Bond type
- Grading, Erosion & Stormwater Bond
- Category
- Contractors & construction
What this bond does
The form addresses Stormwater Management Ordinance 9-84 compliance and construction of the stormwater detention facilities, floodways and/or surface/subsurface drainage facilities shown on approved final plans. Match the facilities actually included in your plan; do not assume every site includes all of those works.
- Who needs it
- The form joins the contractor, acting on behalf of and as authorized agent for the property owner/developer, as the principal. It provides separate owner/developer, contractor-agent and surety execution blocks. Confirm actual authority and legal identities instead of using the designer's name by default.
- Who it protects
- The published form prints $30,000 and names the City of Kentwood and the Kentwood City Engineer or their assigns, payable to the city. It remains effective unless its stated compliance, construction, professional certification and city-approval conditions are met; it also addresses court costs/attorney fees if city court enforcement is necessary. This is not the city's separate soil-erosion undertaking or liability insurance.
Your bond option
This is the option on record for this bond.
- Bond optionPurchase Now (opens in a new tab)Continue to our secure checkout partner, Propeller (opens in a new tab).
The bond amount describes the limit of the bond obligation, not the price. A listed amount does not establish what the requesting party requires. The premium is what you pay and must be confirmed for the actual option. An E&O limit, where listed, is separate errors and omissions insurance.
Sources
- Kentwood Engineering — Storm Water Performance Bond (opens in a new tab)Checked October 23, 2026
Have these ready
- Have the project name/location and final City Engineer-approved stormwater/drainage plans.
- Identify the property owner/developer, authorized contractor-agent and surety exactly as required.
- Confirm the accepted stormwater form, required sum and dates rather than selecting the soil-erosion form.
- Prepare signatures/witnesses, professional as-built certification and separate Engineering Department approval/filing records.
Questions about this bond
Can the contractor simply replace the owner/developer as principal?
The reviewed form describes the contractor as authorized agent for the owner/developer and joins them as principal, with separate execution blocks. Follow the accepted legal-party and authority instructions.
Is an engineer's as-built certification enough for release?
The form also requires approval by Kentwood's Engineering Department. Do not treat the private professional certification alone as city acceptance.
How do I begin the stormwater application?
Purchase Now opens Propeller in a new tab. Check the actual owner/developer and agent, exact City/City Engineer recipient wording, accepted stormwater form, sum and dates. Provider review/issuance and execution/filing are separate from facility construction, as-built certification and city approval.

