Long Branch, NJ — Right Of Way Bond
For Long Branch right-of-way excavation, establish whether the City wants a single-job performance bond, an annual blanket guarantee or later maintenance security. These cover different stages of the permit and restoration process.
Continue to our secure checkout partner, Propeller (opens in a new tab).
- Recorded state
- New Jersey
- Bond type
- Right-of-Way / Street Work Bond
- Category
- Contractors & construction
What this bond does
Provide the City of Long Branch with accepted security for the permitted excavation and restoration work. This is City right-of-way security, not a Long Beach Township requirement or general contractor license.
- Who needs it
- The applicant performing the Long Branch excavation work. The City's ordinance covers disturbance of public improvements and certain material storage or equipment use that can damage the right-of-way.
- Who it protects
- The performance undertaking concerns faithful performance of the work authorized by the permit. Subsequent maintenance security concerns the restored excavation area and related settlement damage, rather than guaranteeing every part of a private development.
Your bond option
This is the option on record for this bond.
- Bond optionPurchase Now (opens in a new tab)Continue to our secure checkout partner, Propeller (opens in a new tab).
The bond amount describes the limit of the bond obligation, not the price. A listed amount does not establish what the requesting party requires. The premium is what you pay and must be confirmed for the actual option. An E&O limit, where listed, is separate errors and omissions insurance.
Sources
- City of Long Branch Code: Article III, Street Excavations (opens in a new tab)Checked October 23, 2026
Have these ready
- Identify the opening, affected public improvements and road authority.
- Prepare the signed Public Works application, sketch, dimensions and proposed dates.
- Obtain the approved performance amount and any required cash component.
- Confirm single-job versus annual blanket scope and any job-specific additional security.
- Ask how final restoration, maintenance security and retainage will be handled.
- Submit the issued bond and obtain the permit before starting.
Questions about this bond
Does Long Branch have a fixed $5,000 requirement for every job?
The performance provision states $5,000 or more, with a cash component addressed by the Director of Public Works. Larger obligations and job-specific additional security must be confirmed.
May a contractor use an annual blanket guarantee?
Section 297-18B permits that arrangement for contractors expecting multiple permits, as well as BPU-regulated utilities. The City Engineer can require extra security when a job exceeds the blanket amount.
Is maintenance security released when paving is finished?
Not automatically. The code describes final approval followed by a two-year maintenance undertaking and retainage arrangements. Obtain the City's instructions for the actual job.
Does the 30-day work-start rule describe the bond term?
No. It concerns commencing work after the permit. The permit's completion date and post-approval maintenance period are separate.