Manassas, VA — Right Of Way And Excavation Permit Bond

Manassas requires a bond before issuing an excavation permit for underground services or entrances connecting to a public roadway. Identify whether your work is excavation, non-excavating ROW use or a utility franchise, then match the city's security request to the correct permit.

Continue to our secure checkout partner, Propeller (opens in a new tab).

Recorded state
Virginia
Bond type
Right-of-Way / Street Work Bond
Category
Contractors & construction

What this bond does

Addresses the city's requested security for repair of damage within Manassas ROW or dedicated easements caused by the covered excavation work.

Who needs it
Applicants and contractors preparing City of Manassas excavation or related ROW work, including qualifying simple residential service projects.
Who it protects
The city's excavation security supports repair of affected ROW and dedicated easements. The accepted instrument defines its terms; non-excavating occupation and franchise obligations are not automatically identical.

Your bond option

This is the option on record for this bond.

The bond amount describes the limit of the bond obligation, not the price. A listed amount does not establish what the requesting party requires. The premium is what you pay and must be confirmed for the actual option. An E&O limit, where listed, is separate errors and omissions insurance.

Distinguish excavation from occupying the ROW

The city describes excavation permits for underground services and related facilities, including gas, water, cable, telephone and sewer, and entrances connecting to a public road. It requires a bond before permit issuance to secure damage repair.

The separate non-excavation ROW permit concerns material/equipment storage and street or sidewalk closures, with a traffic plan where required. Utility franchises have their own approval and must maintain insurance and performance security for the franchise duration. Confirm the applicable route instead of treating them as one permit.

Use the application that fits the applicant and scope

The reviewed general Right of Entry/Excavation application is labeled for simple projects by homeowners and plumbers on the outer fringe of ROW. It is not a universal application for every utility contractor or franchise installation.

That form requires a detailed plan, disturbance and restoration dimensions, schedule and associated permits. Its bond amount is for city completion. It requires Engineering contact at least 72 hours before work and separate utility marking coordination; permit issuance is not itself a utility-locate request.

Confirm the bond, then obtain the work approval

Obtain the city's accepted instrument, legal principal, recipient, amount and coverage dates for the actual permit category. Use the existing Propeller Purchase Now option after the provider confirms that match; do not apply a franchise percentage or a land-disturbance minimum to every excavation.

Deliver the issued instrument through city directions and obtain the permit. Keep it onsite, arrange the required pre-work coordination and schedule restoration inspection. Buying a bond does not authorize a closure, approve an excavation or complete city acceptance.

Sources

Have these ready

  1. Identify City of Manassas jurisdiction and the excavation, non-excavation or franchise permit route.
  2. Use the applicable current application and prepare plans, utilities, disturbance dimensions and schedule.
  3. Confirm the legal principal, city bond form, amount, dates and provider match.
  4. Arrange filing, permit issuance, utility marking, Engineering coordination and restoration inspection.

Questions about this bond

Does every use of the ROW follow the excavation route?

No. The city separately describes non-excavating storage/closures, excavation and franchise utility permits. Identify the actual activity first.

Can every contractor use the reviewed general excavation form?

The reviewed form is expressly for simple homeowner/plumber projects at the outer fringe of ROW. Obtain the correct application for larger work or franchise installations.

Is the excavation bond amount fixed?

No fixed amount is supplied by this catalog option, and the reviewed simple-project form leaves the amount to staff. Obtain the city's amount for your actual permit.

Does issuance replace utility marking or start notice?

No. The reviewed form requires separate utility-location coordination and Engineering contact at least 72 hours before work. Follow the conditions of the applicable issued permit.