Skip to content

Alabama bonds

Mobile County, AL — Right Of Way Bond

Mobile County requests surety bonds for private-contractor utility and right-of-way encroachment work, with an exception for a second residential driveway. Have the county-assigned amount ready, then begin the Propeller application.

Continue to our secure checkout partner, Propeller (opens in a new tab).

Recorded state
Alabama
Bond type
Right-of-Way / Street Work Bond
Category
Contractors & construction

What this bond does

This is the Mobile County right-of-way offering, separate from the City of Mobile product. The county's published requirements connect bonding to utility and encroachment-related work and place permit review with the County Engineering Office.

Who needs it
A private contractor arranging utility or encroachment work within Mobile County right-of-way when the county requires a surety bond.
Who it protects
The bond supplies the security requested for the county work. Use the county's form to identify the exact recipient and secured conditions; a general liability certificate is a separate permit document.

Your bond option

This is the option on record for this bond.

The bond amount describes the limit of the bond obligation, not the price. A listed amount does not establish what the requesting party requires. The premium is what you pay and must be confirmed for the actual option. An E&O limit, where listed, is separate errors and omissions insurance.

Use the county's amount for the work

Mobile County states that the department determines the bond amount case by case. No fixed amount or term is displayed in this offering. Use the amount assigned to your activity rather than choosing a sum from another city's requirement.

The published county policy requires a surety bond before private-contractor utility and right-of-way encroachment work, except installation of a second residential driveway. Let the Engineering Office confirm how that exception applies to your proposed work.

The permit and bond follow separate steps

The county calls for the permit application, applicable guidelines, and checklists to go to its Engineering Office for review. It also requires a general liability certificate naming Mobile County as additionally insured for a private entity working in county right-of-way.

Purchase Now opens Propeller in a new tab for the bond application. After the bond is issued, provide it with the other documents using the county's instructions. Buying a bond does not complete the county permit review.

Sources

Have these ready

  1. The County Engineering Office's permit request, guidelines, and work description.
  2. The contractor's legal name and the exact recipient wording for the bond.
  3. The utility or encroachment location and county-assigned bond amount.
  4. Any required form and effective dates; keep the separate liability certificate with your permit paperwork.

Questions about this bond

Is the City of Mobile bond the same offering?

No. This page identifies Mobile County. Use the authority requesting the permit and bond to choose the corresponding offering; a Mobile address alone does not decide the recipient.

Is there a standard amount for every job?

The county's published requirements say the department determines the amount case by case. Use the amount assigned for your work.

Does the county make a driveway exception?

Its published bonding requirement excepts installation of a second residential driveway. Confirm applicability with the county; do not extend that wording to every driveway project.

Does the bond replace the liability certificate?

No. Mobile County lists the surety bond and the general liability certificate as separate requirements for the described work. Keep both in the permit process where applicable.

Related bonds

Keep exploring

How can we help you get started?

Choose the quote that fits, and we’ll take it from there.

Have a question? Contact us