Norfolk, VA — Right Of Way - Option D: Install A Driveway Or Tie-In Bond
Norfolk's Option D addresses a driveway or tie-in to a public roadway and grading within the ROW. Identify the actual entrance work and permit, then have Public Works confirm this undertaking and the amount before arranging the bond.
Continue to our secure checkout partner, Propeller (opens in a new tab).
- Recorded state
- Virginia
- Bond type
- Right-of-Way / Street Work Bond
- Category
- Contractors & construction
What this bond does
Secures the covered Norfolk driveway/tie-in or ROW grading permit obligations under Option D of the city's Public Works bond.
- Who needs it
- Applicants and contractors arranging security for an entrance connection, driveway tie-in or associated grading in Norfolk's public ROW.
- Who it protects
- The City of Norfolk, Department of Public Works, is the named recipient. The instrument secures the covered permit work and city-protection undertaking; it does not approve an entrance location or every improvement on the property.
Your bond option
This is the option on record for this bond.
- Bond optionPurchase Now (opens in a new tab)Continue to our secure checkout partner, Propeller (opens in a new tab).
The bond amount describes the limit of the bond obligation, not the price. A listed amount does not establish what the requesting party requires. The premium is what you pay and must be confirmed for the actual option. An E&O limit, where listed, is separate errors and omissions insurance.
Sources
- Norfolk — Public Works Surety Bond, Options A–F (opens in a new tab)Checked October 23, 2026
Have these ready
- Identify the principal, entrance address, permit and ROW grading scope.
- Confirm Option D and any additional required categories with Public Works.
- Obtain the amount and arrange city-form execution, acknowledgments and power of attorney.
- File the original, obtain work authorization and retain the city's completion/release record.
Questions about this bond
Does Option D cover ROW grading?
The city form includes grading in the ROW with the driveway/tie-in undertaking. Have Public Works confirm the actual covered work and permit.
Will this approve my driveway location?
No. The bond secures the covered permit undertaking. Entrance approval and work authorization remain separate city decisions.
Is every driveway bond the same amount?
The reviewed form leaves the amount blank. Obtain Public Works' required amount for the actual work rather than selecting an assumed minimum.
What ends the active-permit obligation?
The form ties cancellation for specified active permits to satisfactory completion determined by Public Works. Obtain its documented decision and follow the actual release instructions.

