O'Hara, PA — Street Opening Permit Bond
O’Hara calls its street-opening application a Highway Occupancy Permit application. The form describes $2,000 security held for one year; confirm the accepted bond condition and the start of that period for your work.
Continue to our secure checkout partner, Propeller (opens in a new tab).
- Recorded state
- Pennsylvania
- Bond type
- Right-of-Way / Street Work Bond
- Category
- Contractors & construction
What this bond does
Provide the accepted surety security for an O’Hara Township highway-occupancy or street-opening request.
- Who needs it
- Applicants placing or working on facilities or making openings within O’Hara Township rights-of-way.
- Who it protects
- The township’s required and executed condition defines the bond protection. The local Highway Occupancy Permit title does not make this a PennDOT state-highway bond.
Your bond option
This is the option on record for this bond.
- Bond optionPurchase Now (opens in a new tab)Continue to our secure checkout partner, Propeller (opens in a new tab).
The bond amount describes the limit of the bond obligation, not the price. A listed amount does not establish what the requesting party requires. The premium is what you pay and must be confirmed for the actual option. An E&O limit, where listed, is separate errors and omissions insurance.
Sources
- O’Hara Township — Highway Occupancy (Street Opening) Permit Application (opens in a new tab)Checked October 23, 2026
Have these ready
- Applicant legal name and township request naming the recipient.
- Road location, sketch, One Call reference and pole/line/opening details.
- Accepted condition, required sum, confirmed holding-period dates and filing instructions.
Questions about this bond
Is O’Hara’s Highway Occupancy Permit a PennDOT permit?
This cited application is issued by O’Hara Township. Match the road authority; do not substitute a state-highway bond based on the shared permit wording.
Is this automatically an annually renewing bond?
The form describes a one-year holding period, not an automatic renewal arrangement. Confirm the actual condition and dates.
Does the form apply only to cutting pavement?
It includes poles, pipelines, conduits and improved or unimproved right-of-way information. Describe the actual work to the township.

