O’Hara calls its street-opening application a Highway Occupancy Permit application. The form describes $2,000 security held for one year; confirm the accepted bond condition and the start of that period for your work.

Continue to our secure checkout partner, Propeller (opens in a new tab).

Recorded state
Pennsylvania
Bond type
Right-of-Way / Street Work Bond
Category
Contractors & construction

What this bond does

Provide the accepted surety security for an O’Hara Township highway-occupancy or street-opening request.

Who needs it
Applicants placing or working on facilities or making openings within O’Hara Township rights-of-way.
Who it protects
The township’s required and executed condition defines the bond protection. The local Highway Occupancy Permit title does not make this a PennDOT state-highway bond.

Your bond option

This is the option on record for this bond.

The bond amount describes the limit of the bond obligation, not the price. A listed amount does not establish what the requesting party requires. The premium is what you pay and must be confirmed for the actual option. An E&O limit, where listed, is separate errors and omissions insurance.

Use the township’s occupancy application

The official form names the Township of O’Hara and requests the road, location, work description, excavation extent and Pennsylvania One Call ticket reference.

It covers more than a trench description: separate fields address poles, pipelines and conduits. Identify whether the improved road surface will be opened and the areas affected, even when the work is primarily beside the paved cartway.

Confirm the $2,000 request and dates

The application says work within the township right-of-way requires a $2,000 bond held for one year. Obtain the township’s current accepted surety condition and confirm when that period begins and what is required for release.

Do not turn the stated holding period into an automatic annual-renewal promise. The purchase option itself supplies no fixed amount or term, and any special engineering conditions must be matched to your request.

Arrange security before work authorization

Prepare the sketch, improved/unimproved road information, starting and completion dates and details of poles or line installations. Ask the township who must be the principal and how it wants the executed bond delivered.

Compare that request with the provider application before using the existing purchase link. After issuance, provide the bond and finish the township’s permit process; purchase alone does not approve occupancy or excavation.

Sources

Have these ready

  1. Applicant legal name and township request naming the recipient.
  2. Road location, sketch, One Call reference and pole/line/opening details.
  3. Accepted condition, required sum, confirmed holding-period dates and filing instructions.

Questions about this bond

Is O’Hara’s Highway Occupancy Permit a PennDOT permit?

This cited application is issued by O’Hara Township. Match the road authority; do not substitute a state-highway bond based on the shared permit wording.

Is this automatically an annually renewing bond?

The form describes a one-year holding period, not an automatic renewal arrangement. Confirm the actual condition and dates.

Does the form apply only to cutting pavement?

It includes poles, pipelines, conduits and improved or unimproved right-of-way information. Describe the actual work to the township.