Portsmouth, VA — Right Of Way Permit Bond

Portsmouth's ROW application requires a bond for the described excavation or alteration of city ROW. Prepare the work location, limits, disturbed area and schedule, then obtain Engineering's current bond form before applying through this offering.

Continue to our secure checkout partner, Propeller (opens in a new tab).

Recorded state
Virginia
Bond type
Right-of-Way / Street Work Bond
Category
Contractors & construction

What this bond does

Addresses the bond requirement associated with the identified Portsmouth ROW excavation or alteration permit.

Who needs it
Contractors and applicants seeking City of Portsmouth, Virginia permission to excavate or alter conditions in public ROW.
Who it protects
The accepted city bond defines the protected interests and covered obligations. The application establishes a bond requirement, but the current bond form and this provider's instrument match remain factual-check-pending.

Your bond option

This is the option on record for this bond.

The bond amount describes the limit of the bond obligation, not the price. A listed amount does not establish what the requesting party requires. The premium is what you pay and must be confirmed for the actual option. An E&O limit, where listed, is separate errors and omissions insurance.

Identify the excavation and affected public area

The official application asks for the applicant, primary contact, work-order reference, location, dimensions/bounds, purpose, estimated disturbed area and proposed start/completion dates. Prepare those details for Engineering rather than relying only on the offering title.

The application expressly calls for a bond under City Code section 32-59 and a traffic-control plan reviewed before permit issuance. It is a city excavation/alteration request, not evidence that an unrelated outdoor-dining or state-highway instrument is interchangeable.

Obtain the current bond terms from Engineering

The search-indexed ROW bond link no longer returned the form during this review. Obtain the current instrument, required amount, legal principal, coverage period, execution and release conditions from Engineering before provider issuance.

No minimum, cancellation period or post-acceptance term is asserted from an unretrieved search excerpt. The application is useful for preparation, but it does not independently resolve the accepted bond wording or this offering's current match.

Issue, file and obtain the permit separately

After the city and provider confirm the instrument, use the existing Propeller Purchase Now option with the correct principal and permit details. Deliver the issued document through Engineering's actual instructions; do not assume the provider submits it automatically.

The application requires start/completion notification, a permit kept at the site, backfill and daily cleanup duties, and compliance with city work standards. Complete permit approval and traffic review separately, then arrange the required completion review and documented release.

Sources

Have these ready

  1. Prepare the applicant/contact, work-order reference, ROW location, limits, purpose and schedule.
  2. Obtain Engineering's current bond form, amount, dates and execution/release requirements.
  3. Prepare the traffic-control plan and confirm provider acceptance of the exact instrument.
  4. File security, obtain the permit, arrange start/completion notices and keep it available onsite.

Questions about this bond

Does the city application actually require a bond?

Yes. The retrieved official ROW application expressly requires a bond under section 32-59. Confirm the current accepted instrument and amount with Engineering.

Is a bond term verified here?

No. The indexed bond link did not return the form. The application does not establish the bond's duration, cancellation or release rules.

Is this the same as an outdoor-dining use permit?

Do not assume so. The reviewed application concerns excavating or altering ROW. Ask the city to identify the instrument for your actual activity.

Can I start once the provider issues the bond?

No. Complete the city permit and traffic review, required notices and other work conditions separately. Keep the issued permit available onsite.