Rhode Island — DOT (RIDOT) Right Of Way Performance Bond
RIDOT’s Physical Alteration rules tie security to the work and its cost. Obtain the Department’s approved estimate, condition and amount before ordering right-of-way performance security.
Continue to our secure checkout partner, Propeller (opens in a new tab).
- Recorded state
- Rhode Island
- Bond type
- Right-of-Way / Street Work Bond
- Category
- Contractors & construction
What this bond does
Provide performance security accepted by the Rhode Island Department of Transportation for the applicable state-highway alteration permit.
- Who needs it
- Permittees altering state-highway access, curbs, sidewalks, drainage or other state right-of-way features.
- Who it protects
- Section 4.7 conditions the performance bond on faithful performance of permit work according to the applicable specifications and conditions, for the protection of RIDOT and the State of Rhode Island.
Your bond option
This is the option on record for this bond.
- Bond optionPurchase Now (opens in a new tab)Continue to our secure checkout partner, Propeller (opens in a new tab).
The bond amount describes the limit of the bond obligation, not the price. A listed amount does not establish what the requesting party requires. The premium is what you pay and must be confirmed for the actual option. An E&O limit, where listed, is separate errors and omissions insurance.
Sources
- RIDOT — State Highway Right-of-Way Regulations / PAPA Manual (opens in a new tab)Checked October 23, 2026
- RIDOT — Business and Property Owners (opens in a new tab)Checked October 23, 2026
Have these ready
- RIDOT permittee name, required permit type and accepted bond condition.
- State-road location, plans, approved scope and applicable cost estimate.
- Required sum, dates, surety qualifications and execution/submission instructions.
Questions about this bond
Is this always a fixed $25,000 bond?
No. The manual uses $25,000 as a cost threshold, not a universal penal sum. RIDOT must establish the required security for the actual work.
Can added work change the required security?
Yes. Section 4.7 permits an increased penal sum or an additional bond for added or modified work.
Does the bond purchase grant highway access?
No. Security issuance and RIDOT’s permit approval are separate.

