Rock Island, IL — Excavator's Bond
Rock Island requires an excavator's bond for public-right-of-way excavation and directional boring permits. Prepare the city's form for the contractor, then keep the uploaded copy and mailed original aligned.
Also known as Rock Island Excavator's Bonds
Continue to our secure checkout partner, RLI (opens in a new tab).
- Recorded state
- Illinois
- Bond type
- Excavation Contractor Bond
- Category
- Contractors & construction
What this bond does
The city form names Rock Island as obligee and states a $10,000 penal sum. It addresses excavation rules, guarding/protecting excavations or obstructions and the stated indemnity for city actions, damages and expenses arising from the work or inadequate work.
- Who needs it
- The excavating contractor/principal required by the city's Engineering Division. The city's guide addresses contractors/plumbers; this is not proof that a homeowner or unrelated general contractor may substitute their own name for the required principal.
- Who it protects
- The city bond guidance describes a continuous bond until cancellation, with 30 days' written notice by the bonding company. That is not an automatic yearly expiry, and the separately required permit/inspection process is not completed merely by applying for security.
Your bond option
This is the option on record for this bond.
- Bond optionPurchase Now (opens in a new tab)Continue to our secure checkout partner, RLI (opens in a new tab).
The bond amount describes the limit of the bond obligation, not the price. A listed amount does not establish what the requesting party requires. The premium is what you pay and must be confirmed for the actual option. An E&O limit, where listed, is separate errors and omissions insurance.
Sources
- Rock Island — Excavation Permits (opens in a new tab)Checked October 23, 2026
- Rock Island — Excavation Bond (opens in a new tab)Checked October 23, 2026
- Rock Island — Excavator's Bond Form (opens in a new tab)Checked October 23, 2026
Have these ready
- Identify excavation or directional-boring work and the city ROW permit request.
- Confirm the legal contractor/principal and City of Rock Island recipient.
- Have the accepted $10,000 form/request and required dates/authorized execution.
- Keep a completed upload copy and arrange original delivery to Engineering.
Questions about this bond
Does the city require a separate directional-boring permit path?
Its excavation-permit page expressly includes directional boring in the public right-of-way. Match that work to the city's actual permit and bond instructions.
Is uploading a copy the entire bond-delivery instruction?
No. The current page calls for the copy with the online permit application and the original mailed to Public Works, attention Engineering Division.
How do I start the application here?
Select Purchase Now to open RLI in a new tab. Check the contractor/principal, city recipient, accepted form, required amount and dates. Provider review/issuance and execution precede filing; they do not grant the city permit or finish its inspections.

