Roeland Park, KS — Right Of Way Permit Bond

Roeland Park's ROW instructions call for $5,000 restoration security with a two-year maintenance period, with higher amounts possible for larger projects. Match the City template and current Citizenserve process, then obtain separate work permission and required start notice.

Continue to our secure checkout partner, Propeller (opens in a new tab).

Recorded state
Kansas
Bond type
Right-of-Way / Street Work Bond
Category
Contractors & construction

What this bond does

City of Roeland Park, Johnson County, Kansas security for proper restoration/replacement of covered street ROW.

Who needs it
The legal permit applicant/principal for the City's excavation, trenching, boring or tunneling request and assigned project scope.
Who it protects
The linked template secures restoration/replacement to plans/specifications and its maintenance/formal-release conditions. It does not guarantee every private contract or replace separate liability insurance.

Your bond option

This is the option on record for this bond.

The bond amount describes the limit of the bond obligation, not the price. A listed amount does not establish what the requesting party requires. The premium is what you pay and must be confirmed for the actual option. An E&O limit, where listed, is separate errors and omissions insurance.

Confirm the ROW boundary and assigned security

The City says ROW often extends ten feet or more behind a curb, but each street must be checked. Its permit examples include excavation, directional boring, utility connections, driveway/sidewalk work and traffic closures. Identify the actual public-space operation rather than using a fixed curb-distance assumption.

The current page links a $5,000 template naming the City of Roeland Park, Johnson County, Kansas, with Public Works/Building Inspector approval. Published instructions call for two-year maintenance and separate liability insurance, and warn that a larger project can require a higher bond. Obtain the assigned form, sum and applicant rather than importing a neighboring city's exemption.

Use current intake and keep permission separate from purchase

The current Licensing & Permitting page directs applicants to Citizenserve, with separate ROW Permit, ROW Surety Bond Form, temporary closure and protected-tree requests. Prepare the location sketch or engineering plans and traffic-control plan for lane reductions/closures.

Purchase Now opens Propeller; the option displays no fixed amount or term. Match the City-approved template, principal, assigned sum, covered work and dates with the issuer, arrange execution/accepted filing and insurance, and obtain the issued permission.

The ROW page describes approximately three working days for normal review, locates and at least 48-hour Public Works notice before construction. Emergency utility work has separate notice rules; lane disruption needs immediate coordination. Follow required inspections/restoration and obtain the City's maintenance/release direction; the template does not quote a provider duration or an automatic purchase-anniversary release.

Sources

Have these ready

  1. City-confirmed ROW boundary, excavation/utility/traffic method, site and legal applicant.
  2. Assigned $5,000 or higher security, exact City template/parties/coverage/dates and separate insurance.
  3. Current Citizenserve application, location/engineering plans and lane-control or other separate approvals.
  4. Issuer execution/accepted filing, issued permission, locates/start notice, inspections/restoration and accepted continuation/release.

Questions about this bond

Can I determine the ROW boundary by measuring ten feet from the curb?

The City describes that as typical and says each street must be checked. Confirm the boundary before defining the work.

Is $5,000 sufficient for every project?

The published instructions warn of higher security for larger projects. Obtain the City's actual assigned form and amount.

Does purchase satisfy the 48-hour start notice?

No. Approved permission, utility locates and Public Works notice are separate City requirements. Provider issuance is not work authorization.