Skip to content

Connecticut bonds

Torrington, CT — Excavator License Bond

Torrington's Engineering forms page links its Licensed Excavator Bond to a permit-performance form. Prepare the road/right-of-way work and permit holder's legal name, not just a general business-license description.

Continue to our secure checkout partner, Propeller (opens in a new tab).

Recorded state
Connecticut
Bond type
Excavation Contractor Bond
Category
Contractors & construction

What this bond does

The linked form binds the principal and surety to the City of Torrington for the referenced road/ROW permit conditions. It addresses completion, city damages/expenses and restoration of affected streets and facilities, including excavation backfill, drainage and pavement.

Who needs it
The contractor or permit holder named as principal in the city's accepted documents. Engineering lists a $5,000 performance bond and specifies its form; the form's amount field is blank, so confirm the actual required sum rather than inventing a displayed option amount.
Who it protects
The form continues until the City Engineer or authorized personnel gives written consent to cancellation. If the principal fails to finish required work, it makes the bonding company responsible for arranging completion to the city's satisfaction. It is not a promise of automatic release at an annual license renewal.

Your bond option

This is the option on record for this bond.

The bond amount describes the limit of the bond obligation, not the price. A listed amount does not establish what the requesting party requires. The premium is what you pay and must be confirmed for the actual option. An E&O limit, where listed, is separate errors and omissions insurance.

The form refers to a permit or permits for work on, about or adjacent to a road and use of the road right-of-way. Its restoration obligation is broader than simply filling a trench: the stated street/facility adjustments and city indemnity matter too.

Engineering distinguishes its general ROW, driveway ROW and utility ROW paths and lists liability insurance separately. Obtain the right permit instructions, accepted bond amount and witness/authorized signatures. Buying the security does not select or issue the appropriate city permit.

Sources

Have these ready

  1. Have the road/ROW work description and applicable city permit record.
  2. Confirm the legal permit holder/principal and City of Torrington recipient.
  3. Use Engineering's required form and confirm the sum and dates.
  4. Prepare witness/authorized signatures and separate liability-insurance documents.

Questions about this bond

Is this only a general license-compliance promise?

The city's linked form secures the referenced road/ROW permit work, completion, city indemnity and stated restoration obligations. Read it with the applicable permit.

Does it end automatically after one year?

The form says it continues until written cancellation consent from the City Engineer or authorized personnel. Do not replace that language with an assumed annual term.

How do I begin the surety application?

Select Purchase Now to open Propeller in a new tab. Check the legal permit holder, City of Torrington recipient, required form, sum and dates. Provider review/issuance and execution precede city filing; the bond application is not the city ROW permit.

Related bonds

Keep exploring

How can we help you get started?

Choose the quote that fits, and we’ll take it from there.

Have a question? Contact us