Tulsa, OK — Right-Of-Way Non-Arterial Bond
Use Tulsa's non-arterial ROW offering only after confirming that classification for the affected street. The city's application separately identifies street cuts and traffic blockages; a short job or residential address does not establish the correct bond category.
Continue to our secure checkout partner, Propeller (opens in a new tab).
- Recorded state
- Oklahoma
- Bond type
- Right-of-Way / Street Work Bond
- Category
- Contractors & construction
What this bond does
Provide the bond requested for non-arterial work within the City of Tulsa right-of-way. Confirm the accepted form, required sum and coverage before issuance.
- Who needs it
- Contractors or permit applicants whose City of Tulsa work is confirmed as non-arterial, rather than work requiring the separate arterial offering.
- Who it protects
- The city's accepted non-arterial condition defines the protected recipient and obligations. The offering is not the permit itself, a liability policy or proof that all work on a private construction contract is guaranteed.
Your bond option
This is the option on record for this bond.
- Bond optionPurchase Now (opens in a new tab)Continue to our secure checkout partner, Propeller (opens in a new tab).
The bond amount describes the limit of the bond obligation, not the price. A listed amount does not establish what the requesting party requires. The premium is what you pay and must be confirmed for the actual option. An E&O limit, where listed, is separate errors and omissions insurance.
Sources
- Tulsa: Right of Way Minor Construction Permit Application (opens in a new tab)Checked October 23, 2026
Have these ready
- Confirm the non-arterial designation and all streets affected.
- Describe the cut, driveway, bore or other ROW activity and traffic restrictions.
- Obtain the city's exact condition, sum, dates and coverage instructions.
- Review the issued bond and complete separate permit, insurance and inspection steps.
Questions about this bond
Does a residential address prove the road is non-arterial?
No. Tulsa's application asks for road classification separately from residential/commercial information. Have the city confirm the category for the affected street.
Is a driveway change covered by buying the bond?
The application includes driveway work but says widening, changing or adding a driveway requires zoning review. The bond does not replace that review or the work permit.
Does this option establish a renewal or cancellation deadline?
No. The option does not state a term, and the permit application is not the complete bond condition. Confirm the required dates and continuing-security rules with Tulsa.

