Warren, PA — Street Opening Permit Bond
Obtain a written bond request from Warren Public Works before using this option. The city’s street-opening materials establish permit, restoration and insurance duties but do not verify this offering’s required surety condition or amount.
Continue to our secure checkout partner, Propeller (opens in a new tab).
- Recorded state
- Pennsylvania
- Bond type
- Right-of-Way / Street Work Bond
- Category
- Contractors & construction
What this bond does
Arrange the bond specifically accepted for the applicable City of Warren, Pennsylvania street-opening request.
- Who needs it
- Applicants planning a tunnel, opening, test hole or excavation under a City of Warren street permit.
- Who it protects
- The executed bond condition must identify the covered obligation. The city’s separate permit and liability-insurance provisions do not establish a universal surety requirement for every opening.
Your bond option
This is the option on record for this bond.
- Bond optionPurchase Now (opens in a new tab)Continue to our secure checkout partner, Propeller (opens in a new tab).
The bond amount describes the limit of the bond obligation, not the price. A listed amount does not establish what the requesting party requires. The premium is what you pay and must be confirmed for the actual option. An E&O limit, where listed, is separate errors and omissions insurance.
Sources
- City of Warren, Pennsylvania — Street Opening Permits (opens in a new tab)Checked October 23, 2026
- Warren Code — Article VIII, Street Excavations, Openings and Pavement Cuts (opens in a new tab)Checked October 23, 2026
Have these ready
- Written City of Warren, Pennsylvania surety request and road-authority confirmation.
- Applicant name, exact opening location, plan and work/restoration details.
- Accepted bond condition, amount, dates and execution/filing instructions.
Questions about this bond
Does Chapter 410 confirm one standard bond amount?
The reviewed street-opening article does not establish the required condition or fixed sum for this offering. Obtain the city’s written request.
Does annual utility insurance evidence establish an annual bond?
No. The code’s insurance arrangement is separate from surety security. Confirm any actual bond requirement independently.
Is this automatically suitable for a state-highway opening?
No. The city article excludes Commonwealth-maintained or Commonwealth-permitted roads. Follow the requesting road authority’s requirements.

