Westport, CT — Sanitary Sewer Connection And Road Opening Bond

Westport's Permit Bond can address sanitary-sewer connections and/or road-opening work. Identify the actual permits; a noted expiration date does not replace DPW's written consent to cancellation.

Continue to our secure checkout partner, Propeller (opens in a new tab).

Recorded state
Connecticut
Bond type
Right-of-Way / Street Work Bond
Category
Contractors & construction

What this bond does

Security to the Town of Westport for the sanitary-sewer and/or road-opening permits identified by its instrument, including specified ROW or other Town-property work.

Who needs it
Westport's sanitary-sewer instructions allow only the contractor performing the sewer work to apply. Match the legal principal to the actual Town permit request, whether sewer, road opening, or both.
Who it protects
The Town form secures permit undertakings and specified indemnity, including expenses for refilling excavations, drainage replacement, and pavement/sidewalk restoration. It concerns the permitted activities, not every private construction contract.

Your bond option

This is the option on record for this bond.

The bond amount describes the limit of the bond obligation, not the price. A listed amount does not establish what the requesting party requires. The premium is what you pay and must be confirmed for the actual option. An E&O limit, where listed, is separate errors and omissions insurance.

Bonding Obligations for Contractors

Contractors seeking to perform sanitary sewer work must maintain a performance and guaranty bond on file with the Westport Department of Public Works. The bond must be in an amount not less than $25,000.00 to satisfy municipal permitting conditions.

The sanitary-sewer instructions require an expiration date to be noted. The linked $25,000 Town Permit Bond nevertheless continues until DPW's Director or designee consents in writing to cancellation. Separate insurance instructions also include umbrella/excess coverage; do not treat a displayed date or insurance certificate as bond release.

Preparing Your Documentation

For the sanitary-sewer application, keep the listed Connecticut plumbing license current: P1 (unlimited), P2, P6, P7 (limited), W8, or W9. Supply the property address and site-specific CBYD ticket. The instruction that only the working contractor may apply concerns this sewer application.

Register on Westport's portal to begin the relevant Town application. The bond form may address sewer connection and/or road-opening permits, including specified work in Town ROW or other Town property; confirm the actual permit references rather than assuming both activities are required.

Permit Issuance and Review

DPW reviews the sanitary-sewer application and current bond/insurance documents, advising what permit or additional information the location requires. No fixed bond amount or term is displayed in this provider option. Check the issued document, file it as directed, and complete actual permit authorization before work.

A permit fee of $125 is associated with the application process. The sanitary-sewer instructions' no-other-approvals statement concerns that application, not every approval for a larger project.

Sources

Have these ready

  1. Confirm the legal contractor/principal, Town recipient, accepted form, and at least $25,000 security requested for the sanitary-sewer application.
  2. Obtain a valid Call Before You Dig (CBYD) ticket number by calling 811 or visiting the official CBYD website.
  3. For the sanitary-sewer application, keep the listed Connecticut plumbing license (P1, P2, P6, P7, W8, or W9) current and on file.
  4. Prepare separate required insurance, expiration information, actual permit references, and DPW filing/cancellation directions.

Questions about this bond

What is the minimum bond amount for this work?

The bond must be in an amount not less than $25,000.00.

Who is required to provide this bond?

For the sanitary-sewer application, only the contractor performing the sewer work may apply. The Town instrument can address sewer and/or road-opening permits; confirm the actual principal and work covered.

Is this bond the same as my liability insurance?

No. The sanitary-sewer instructions separately require commercial general liability, automobile, umbrella/excess, and workers' compensation/employers' liability documentation. Use the current Town requirements for each.

How do I apply for the permit once I have my bond?

Purchase Now opens Propeller for the bond in a new tab. Separately, register on Westport's portal, select the department and Start Application, and provide current documents to DPW. Issuance and filing do not themselves grant work permission.

Related bonds

Keep exploring

How can we help you get started?

Choose the quote that fits, and we’ll take it from there.

Have a question? Contact us