Winona MN, MN — Right Of Way Excavation Bond
Winona's selected 2026 licensing packet uses a $10,000 continuing General License Bond with a right-of-way excavation category. Match that work category and your registered business name before applying. The continuing bond and annual licence paperwork do not replace the City's separate excavation permit.
Continue to our secure checkout partner, Propeller (opens in a new tab).
- Recorded state
- Minnesota
- Bond type
- Right-of-Way / Street Work Bond
- Category
- Contractors & construction
What this bond does
Support the City of Winona, Minnesota ROW excavation licence/registration obligation identified in its actual licensing packet.
- Who needs it
- The legal Winona ROW excavation applicant; a drainlayer or concrete applicant must also select the actual work categories being sought.
- Who it protects
- The City form protects Winona and persons suffering damages from breach of its conditions. It addresses faithful performance of the selected licensed work, applicable code/permit compliance and the stated City indemnity, not an unrestricted guarantee for every construction contract.
Your bond option
This is the option on record for this bond.
- Bond optionPurchase Now (opens in a new tab)Continue to our secure checkout partner, Propeller (opens in a new tab).
The bond amount describes the limit of the bond obligation, not the price. A listed amount does not establish what the requesting party requires. The premium is what you pay and must be confirmed for the actual option. An E&O limit, where listed, is separate errors and omissions insurance.
Sources
- Winona: Right of Way Permits and Licensing (opens in a new tab)Checked October 22, 2026
- Winona: selected 2026 licensing packet and City bond (opens in a new tab)Checked October 22, 2026
Have these ready
- Legal licensee/principal name, DBA where applicable and ROW excavation work category.
- City $10,000 continuing form, required execution/acknowledgments and power of attorney.
- Existing bond status with Engineering and current separate insurance/compensation requirements.
- Excavation location, utility/facility and construction details, dates and actual permit approval.
Questions about this bond
Does the bond expire with the annual Winona licence?
The selected City form is continuing until cancelled. The annual licence and its paperwork have a different cycle.
Can an emailed certificate replace the original bond?
The packet requires a hard-copy original City bond with its execution documents. An insurance certificate is a separate requirement.
Does ROW registration let excavation start immediately?
No. The excavation application requires Engineering approval and the actual permit before work starts.