For a grading-security request from Yorba Linda, prepare the city grading project—not a street-improvement estimate or water-district approval in its place. The city's application separates the property owner, applicant and engineers.

Continue to our secure checkout partner, Propeller (opens in a new tab).

Recorded state
California
Bond type
Building / Excavation / Grading Permit Bond
Category
Contractors & construction

What this bond does

Match the bond to the grading obligation in the city's actual permit/security request and accepted plans. The public grading documents help identify the site and work, but do not establish a universal bond mandate or reproduce the complete surety undertaking.

Who needs it
The principal required by the city's security instructions. The permit application has distinct owner, applicant, civil engineer and soils engineer fields; being the person submitting plans does not automatically settle whose legal name belongs on the bond.
Who it protects
Grading permission, security and outside-agency review are different steps. Yorba Linda's checklist separates grading from street improvements and calls for separate OCFA/Yorba Linda Water District review where applicable. Those agencies' review roles do not establish this bond's recipient.

Your bond option

This is the option on record for this bond.

The bond amount describes the limit of the bond obligation, not the price. A listed amount does not establish what the requesting party requires. The premium is what you pay and must be confirmed for the actual option. An E&O limit, where listed, is separate errors and omissions insurance.

Use the selected grading documents and city security instructions

The initial-submittal checklist offers grading plans, geotechnical and water-quality materials, an import/export haul-route exhibit, off-site grading permission and the city's grading cost worksheet as applicable. Use the items selected for the project; do not assume every listed document is required for every site.

The grading cost worksheet and proposed start date do not themselves approve a bond amount or effective date. Obtain the accepted security form, principal/obligee, sum, period and filing directions. Completion certificates listed on the city page are not, by themselves, a surety release instruction.

Sources

Have these ready

  1. Have the grading permit/project location, type of work and disturbed area.
  2. Identify owner, applicant, civil/soils engineers and required legal bond principal.
  3. Collect the grading documents selected by the city, including off-site permission if called for.
  4. Obtain the actual security request, accepted form, sum, dates and completion/release instructions.

Questions about this bond

Does submitting the grading estimate establish my bond amount?

No approved security amount is established by that worksheet alone. Obtain the city's actual required sum and accepted surety form.

Can I use the street-improvement package instead?

The city separates grading and street-improvement submittals. Match the security to the requested activity rather than assuming those packages or agency recipients are interchangeable.

How can I proceed with a confirmed security request?

Choose Purchase Now to open Propeller in a new tab. Check the legal principal, city-required recipient, grading project, accepted form, sum and dates. Provider review/issuance, execution and filing do not grant the grading permit or release the obligation.