Ankeny, IA — Utility Installation Right Of Way Bond
Ankeny distinguishes franchise utility coordination from additional non-franchise utility requirements. Match the actual installation, permittee and City security request; non-franchise restoration security is not automatically the same instrument or annual arrangement for every utility.
Continue to our secure checkout partner, Propeller (opens in a new tab).
- Recorded state
- Iowa
- Bond type
- Right-of-Way / Street Work / Encroachment Bond
- Category
- Contractors & construction
What this bond does
Security matched to Ankeny's actual utility-installation ROW/public-asset or public-utility-easement request.
- Who needs it
- The City-required utility applicant/principal, with facility owner, franchise status and performing contractor correctly identified.
- Who it protects
- Posted non-franchise §122.08 secures restoration of disturbed public space/assets, not every private utility contract. Actual accepted form and scope control liability and do not grant missing property/easement rights.
Your bond option
This is the option on record for this bond.
- Bond optionPurchase Now (opens in a new tab)Continue to our secure checkout partner, Propeller (opens in a new tab).
The bond amount describes the limit of the bond obligation, not the price. A listed amount does not establish what the requesting party requires. The premium is what you pay and must be confirmed for the actual option. An E&O limit, where listed, is separate errors and omissions insurance.
Sources
- Ankeny: Development Engineering and actual ROW link (opens in a new tab)Checked October 22, 2026
- Ankeny: current ROW Permit page (opens in a new tab)Checked October 22, 2026
- Ankeny posted Chapter 122: scope and §122.08 performance security (opens in a new tab)Checked October 22, 2026
- Ankeny: linked ROW submittal requirements (opens in a new tab)Checked October 22, 2026
- Ankeny: linked General Conditions for Work in Public ROW (opens in a new tab)Checked October 22, 2026
Have these ready
- Actual utility/facility, franchise status, owner/principal and contractor for the City-controlled installation.
- Engineering-confirmed form/sum, per-installation or specifically allowed annual scope and separate insurance.
- Route/utility/easement plans, method/depth and actual traffic-control review.
- Executed/accepted security, issued on-site packet, distinct owner/Engineering notices and restoration/inspection/release instructions.
Questions about this bond
Does Chapter 122 apply identically to every utility?
It has specific non-franchise provisions and exceptions. The City separately coordinates franchise work; obtain the actual ROW/utility request rather than assuming a universal exemption or instrument.
Can any installation use an annual bond automatically?
Posted §122.08 makes the alternate arrangement discretionary for numerous concurrent utility projects. Have the Engineer approve actual scope, form and amount.
Does the provider receipt let the crew start?
No. Obtain the approved City permit packet, accepted security and required notices/traffic arrangements. The crew must have access to the issued packet on site.