Aurora, IL — Right Of Way Permit Bond
Prepare Aurora's actual ROW security request alongside the excavation, utility or paving application. The City's application calls for licensed and bonded contractors, but does not supply this offering's accepted instrument or amount.
Continue to our secure checkout partner, Propeller (opens in a new tab).
- Recorded state
- Illinois
- Bond type
- Right-of-Way / Street Work Bond
- Category
- Contractors & construction
What this bond does
Security requested for the responsible party's work in Aurora, Illinois public right-of-way, matched to the City's actual form.
- Who needs it
- The contractor or other principal identified in the City's written ROW bonding request, coordinated with the owner and project engineer.
- Who it protects
- The accepted bond defines the secured duties. The application requires conformity to approved plans and includes applicant indemnity, but those permit conditions do not establish every term of a surety bond.
Your bond option
This is the option on record for this bond.
- Bond optionPurchase Now (opens in a new tab)Continue to our secure checkout partner, Propeller (opens in a new tab).
The bond amount describes the limit of the bond obligation, not the price. A listed amount does not establish what the requesting party requires. The premium is what you pay and must be confirmed for the actual option. An E&O limit, where listed, is separate errors and omissions insurance.
Sources
- City of Aurora: 2026 right-of-way work application (opens in a new tab)Checked October 22, 2026
Have these ready
- City ROW request and accepted instrument; correct legal principal and recipient.
- Site/work order, actual excavation, utility or paving scope and plans.
- Contractor registration, engineer/contact roles, City-assigned sum and dates.
- Accepted filing, work permission, utility locating, inspections and security release.
Questions about this bond
Is the engineer listed on the application automatically the bond principal?
No. Use the party required by the City's actual bonding request, not automatically the engineer, plan submitter or contact.
Does the concrete-placement season set the bond term?
No. Those application conditions govern work timing. Obtain the required bond period and accepted instrument separately.
Can I start after submitting the application or buying the bond?
No. The application explicitly withholds construction permission at submission. Confirm the issued security, City acceptance and actual permit authorization.