Collinsville, IL — Right Of Way Bond
Prepare Collinsville ROW security using the actual excavation application and City restoration calculation. Public Works reviews this permit separately from the building approvals a project may also need.
Continue to our secure checkout partner, Propeller (opens in a new tab).
- Recorded state
- Illinois
- Bond type
- Right-of-Way / Street Work Bond
- Category
- Contractors & construction
What this bond does
Requested performance security for the actual Collinsville ROW/excavation activity and restoration obligation.
- Who needs it
- The authorized owner, agent, contractor or other applicant responsible for the City's identified ROW work and security request.
- Who it protects
- The City's application provides for bond review and site-restoration security. The accepted instrument defines the secured duties; traffic control, liability insurance and work approval are separate requirements.
Your bond option
This is the option on record for this bond.
- Bond optionPurchase Now (opens in a new tab)Continue to our secure checkout partner, Propeller (opens in a new tab).
The bond amount describes the limit of the bond obligation, not the price. A listed amount does not establish what the requesting party requires. The premium is what you pay and must be confirmed for the actual option. An E&O limit, where listed, is separate errors and omissions insurance.
Sources
- City of Collinsville: ROW/excavation application and standards (opens in a new tab)Checked October 22, 2026
- City of Collinsville: building and ROW permit distinctions (opens in a new tab)Checked October 22, 2026
Have these ready
- Actual ROW/excavation activity, location(s), authorized applicant and City request.
- Restoration materials/quantities, City-confirmed calculation and accepted instrument.
- Principal, recipient, sum, dates, plans, traffic control, insurance and emergency contact.
- Accepted security, work approval, advance notices, final inspection and actual release.
Questions about this bond
Does a building permit replace the ROW excavation permit?
No. The City's page describes the Public Works permit as separately reviewed and often needed alongside a building permit.
Is there one flat security amount stated by this option?
No fixed amount or term is displayed. The application has restoration calculations and different utility/non-utility fields; get the City's actual determination.
When does the application require City notice?
At least one working day before commencing and necessary inspections, and at completion for final inspection and closure. Obtain the accepted bond's release instructions separately.