Bloomington, IN — Lane, Bike Lane, Or Sidewalk Closure Bond
Identify exactly which Bloomington travel lane, bicycle space or sidewalk will close, for how long and with what alternative access. The City's ROW process covers closures without excavation; a whole-street closure does not automatically include the adjacent public spaces.
Continue to our secure checkout partner, Propeller (opens in a new tab).
- Recorded state
- Indiana
- Bond type
- Right-of-Way / Street Work Bond
- Category
- Contractors & construction
What this bond does
Security requested for the actual Bloomington lane, bike-lane or sidewalk closure and accepted permit conditions.
- Who needs it
- The legal closure applicant, coordinated with the organizer, property user or contractor responsible for the traffic/pedestrian arrangements.
- Who it protects
- The accepted City instrument defines the secured closure duties. Buying security does not grant traffic authority or guarantee every private event or construction obligation.
Your bond option
This is the option on record for this bond.
- Bond optionPurchase Now (opens in a new tab)Continue to our secure checkout partner, Propeller (opens in a new tab).
The bond amount describes the limit of the bond obligation, not the price. A listed amount does not establish what the requesting party requires. The premium is what you pay and must be confirmed for the actual option. An E&O limit, where listed, is separate errors and omissions insurance.
Sources
- Bloomington Engineering: current ROW closure and Civic Access process (opens in a new tab)Checked October 22, 2026
- Bloomington: Typical ROW Use Flowchart, 2024 (opens in a new tab)Checked October 22, 2026
- Bloomington: linked ROW Bond Example 1 (opens in a new tab)Checked October 22, 2026
- Bloomington: linked ROW Bond Example 2 (opens in a new tab)Checked October 22, 2026
Have these ready
- Each affected lane, sidewalk, protected bicycle space, path or regulated parking area, with dates/limits and alternative access.
- Engineering approval/security direction and confirmed match to this specific offering.
- Legal principal/City recipient, accepted form/sum/dates, insurance, site and temporary traffic plans.
- Civic Access application, issued bond acceptance, actual closure approval, reopening and release/continuation instructions.
Questions about this bond
Can a street closure automatically include the adjacent sidewalk?
No. The City's flowchart excludes adjacent sidewalks and other identified public spaces from that category. Show the actual sidewalk/bicycle/parking impacts separately.
Do I need City permission if nobody is digging?
The City's FAQ says closures require ROW permission even without excavation. Confirm the approved arrangement for the actual space and dates.
Does the final closure date establish bond expiration?
Not by itself. Use the accepted issued document's dates/conditions and actual City direction; the linked examples differ and do not guarantee the provider's terms.