Franklin County, VA — Erosion And Sediment Control Bond

Franklin County's single-family agreement in lieu of an erosion-control plan is permit paperwork, not a surety bond. If the county has asked for separate E&S security, use that actual request to prepare this application instead of assuming the agreement removes or establishes a bond requirement.

Continue to our secure checkout partner, Propeller (opens in a new tab).

Recorded state
Virginia
Bond type
Grading, Erosion & Stormwater Bond
Category
Contractors & construction

What this bond does

This listing is for the erosion and sediment-control bond requested for the project. The county's November 2024 agreement describes the applicant's control and stabilization responsibilities but does not state a universal security amount, purchased term or operative bond conditions.

Who needs it
The owner or applicant named in the county's accepted security instructions. The agreement also identifies a certified Responsible Land Disturber with a valid number; that project role should not automatically be substituted for the legal bond principal.
Who it protects
The requested undertaking supports the E&S duties specified in its accepted form. A building permit, RLD credential or agreement in lieu of a plan is not the same instrument, and none should be described as the contractor's liability coverage.

Your bond option

This is the option on record for this bond.

The bond amount describes the limit of the bond obligation, not the price. A listed amount does not establish what the requesting party requires. The premium is what you pay and must be confirmed for the actual option. An E&O limit, where listed, is separate errors and omissions insurance.

Describe the whole disturbance, not just the house footprint

The county's agreement asks for total estimated disturbance across the entire project, including vegetation removal, grading and driveways. Its diagram and narrative address existing drainage, critical erosion areas, control measures and permanent stabilization. Keep those site details with the request used to determine security.

The applicant agrees to reasonable erosion-control requirements set by county inspectors, with a plan or enforcement possible for noncompliance. The agreement is not proof that a surety form has been accepted, that security is waived or that final stabilization automatically releases a bond.

Sources

Have these ready

  1. Gather the project/site and tax-map/parcel details and the applicant's legal name.
  2. Have the county E&S request, relevant agreement or approved plan and the whole-project disturbed area.
  3. Keep the valid RLD information, site diagram, drainage/critical-area narrative and proposed controls available.
  4. Confirm the accepted bond form, legal principal/recipient, required sum/dates and execution/filing instructions before issuance.

Questions about this bond

Is the agreement in lieu itself the bond?

No. It records erosion-control responsibilities for the described single-family process. Any separate security request must be matched to the accepted undertaking.

Should the RLD automatically be the bond principal?

No. Certification as the Responsible Land Disturber identifies a project role. Use the principal required by the county's actual security instructions.

How can I start the bond application?

Purchase Now opens Propeller in a new tab. Match the Franklin County request, applicant, accepted form/recipient, required sum and dates. Application review and issuance are separate from execution, county filing and approval of the plan or agreement.