Galveston, TX — Right Of Way Bond

Galveston's utility ROW process covers work such as buried lines, aerial facilities, poles and network nodes. Identify the installation and required security before applying: the city's buried-line bond calculation should not be assumed to apply to every kind of ROW work.

Continue to our secure checkout partner, Propeller (opens in a new tab).

Recorded state
Texas
Bond type
Right-of-Way / Street Work Bond
Category
Contractors & construction

What this bond does

Addresses requested security for Galveston ROW work, with the applicable utility or other construction process determining the required instrument.

Who needs it
Utility contractors or other applicants whose City of Galveston work requires a ROW, permit or performance bond.
Who it protects
The accepted bond defines the city's security. Galveston's utility sequence separately makes the contractor responsible for damage and restoration of utilities and affected public/private areas to preconstruction condition.

Your bond option

This is the option on record for this bond.

The bond amount describes the limit of the bond obligation, not the price. A listed amount does not establish what the requesting party requires. The premium is what you pay and must be confirmed for the actual option. An E&O limit, where listed, is separate errors and omissions insurance.

Choose the utility or other ROW process

The utility application page includes aerial lines, fiber, boring/trenching, nodes, poles, cabinets and utility tie-ins. The city has a separate ROW construction route for driveways, sidewalks, curbs, gutters and culverts. Temporary occupation or lane obstruction can also involve separate approvals. Describe the actual activity rather than using one street-work request for all of them.

Confirm the amount for the installation

For proposed buried lines, Engineering publishes a calculation of linear feet multiplied by 100, with a $10,000 minimum when the line is less than 100 feet. Its example of 300 feet produces a $30,000 bond. Ask Engineering for the amount applicable to aerial facilities, nodes or other work rather than extending the buried-line formula.

The utility sequence requests a copy of the contractor's annual performance/ROW-permit bond before final conditional approval and permit issuance. Confirm the required wording and coverage dates; the option itself does not supply a structured fixed term.

Complete design review and field clearance

The utility process calls for engineered route information, plans/profiles, utility-conflict investigation, insurance and any necessary outside-authority permission. It also requires alignment marking and Engineering field review/clearance before utility work.

Use the existing Propeller option with the confirmed city request. After issuance, supply the bond through the applicable review process. A bond purchase is not conditional approval, a ROW permit, field clearance or permission to close a lane.

Sources

Have these ready

  1. Identify utility installation versus the city's other ROW construction route.
  2. Measure the proposed buried-line length where that calculation applies.
  3. Obtain Engineering's required amount, bond wording and coverage dates.
  4. Prepare the plans, insurance, outside permissions and required field-clearance steps.

Questions about this bond

Is every Galveston ROW bond $10,000?

No. The utility page describes a buried-line length calculation and a $10,000 minimum below 100 feet. Confirm the amount for the actual installation.

Does the buried-line formula cover aerial facilities and nodes?

The published calculation specifically refers to proposed buried lines. Ask Engineering to identify the requirement for other facilities.

Can work begin when the bond is issued?

No. The utility sequence separates the bond, final conditional approval, ROW permit and field review/clearance. Complete the approvals applicable to the job.