Green's 2026 right-of-way application sends plans to Zoning for Engineering review and a project-specific bond amount. Confirm that the city will accept this surety offering for your work; the application also gives separate instructions for cash security.

Continue to our secure checkout partner, Propeller (opens in a new tab).

Recorded state
Ohio
Bond type
Right-of-Way / Street Work Bond
Category
Contractors & construction

What this bond does

This offering is labelled for a City of Green, Ohio right-of-way permit bond. Match it to the city's project security request for the actual apron, opening, utility or other covered work, not to Greene County's requirements.

Who needs it
The contractor or applicant preparing a City of Green right-of-way project, with the property owner and field contact identified on the permit application.
Who it protects
The city application connects bond release with inspection approval, but does not reproduce a complete surety condition. Obtain the accepted instrument to identify the secured work and the city's remedies.

Your bond option

This is the option on record for this bond.

The bond amount describes the limit of the bond obligation, not the price. A listed amount does not establish what the requesting party requires. The premium is what you pay and must be confirmed for the actual option. An E&O limit, where listed, is separate errors and omissions insurance.

Submit the project for an amount determination

The 2026 form asks for a project drawing and dimensions, no larger than 11 by 17 inches, at least 14 days before the project starts. Engineering reviews the submission and establishes the bond amount; Zoning contacts the applicant when the permit is processed.

Identify new construction versus reconstruction and the actual activity, such as an apron, culvert, sidewalk, utility or road opening. Prepare the address, contractor, owner, field contact and plans, and notify Engineering if the project changes.

Confirm surety acceptance separately from cash instructions

The form says cash bonds must be money orders or certified checks payable to the City of Green. That does not establish the condition or acceptance of this provider's surety bond, nor does it prove that every security request is cash-only.

Ask Engineering which form of security it accepts for your project, the required sum, named recipient and dates. No universal surety minimum, annual duration or cancellation rule is supplied by this application.

Match the provider document before filing

Once the city confirms the instrument, use Purchase Now for Propeller's Green Right of Way Permit Bond application. Confirm what will be issued, then check the legal applicant, form, sum and dates before providing it to the city.

The permit form calls for at least 48 hours' notice to Engineering before curb cuts and for pre- and post-inspections. Bond purchase does not approve those activities, schedule inspections or release the security; follow the city's project instructions.

Sources

Have these ready

  1. Confirm this is a City of Green request, not Greene County.
  2. Prepare the project drawing, dimensions, work category and contacts.
  3. Obtain Engineering's amount and explicit acceptance of the required security form.
  4. Apply for the matching bond, submit the issued document and arrange the required inspections.

Questions about this bond

Does Green publish a fixed bond amount on this application?

No. The 2026 form says Engineering will review the project and establish the amount.

Does the cash-bond instruction prove this surety is accepted?

No. Confirm the security type and accepted surety wording with Engineering before completing this provider application.

When should the project application be submitted?

The form asks for the application and drawing at least 14 days before the project start. That is not a promise of approval within a fixed period.

What happens after bond issuance?

Check and provide the issued instrument as the city directs, obtain permission and coordinate required inspections. The form separately records inspection approval and bond release.

Related bonds

Keep exploring

How can we help you get started?

Choose the quote that fits, and we’ll take it from there.

Have a question? Contact us