Kennewick, WA — Utility & Street Construction Bond
Match Kennewick's actual utility/street work request and right-of-way permit before applying. The City's builder handout calls for contractor bond and insurance evidence before permit issuance; a sewer-hookup permit is not permission to cut into the street.
Continue to our secure checkout partner, Propeller (opens in a new tab).
- Recorded state
- Washington
- Bond type
- Contractor License / Registration Bond
- Category
- Contractors & construction
What this bond does
Identify the security accepted for the actual City work and permit without assuming State registration automatically completes City approval.
- Who needs it
- Contractors identifying the work location, street/right-of-way activity and City-requested evidence.
- Who it protects
- The handout refers to Chapter 5.56, Section IV for bonding and insurance but does not reproduce this offering's complete instrument. Confirm whether the City accepts existing security or requests another form, and its exact recipients, conditions, amount and dates.
Your bond option
This is the option on record for this bond.
- Bond optionPurchase Now (opens in a new tab)Continue to our secure checkout partner, Propeller (opens in a new tab).
The bond amount describes the limit of the bond obligation, not the price. A listed amount does not establish what the requesting party requires. The premium is what you pay and must be confirmed for the actual option. An E&O limit, where listed, is separate errors and omissions insurance.
Sources
- Kennewick — General Information for Builders, Contractors and Homeowners (opens in a new tab)Checked October 23, 2026
Have these ready
- Identify the actual utility/street/right-of-way work and permit.
- Obtain the City's security request and accepted form.
- Confirm existing-security acceptance or another instrument, recipients, sum and dates.
- After issuance: check execution and complete confirmed City filing.
Questions about this bond
Does a sewer hookup permit authorize cutting into the street?
The City's handout says no. Right-of-way work needs a separate permit.
Does the handout settle this bond's amount and period?
No. Obtain the actual accepted instrument and current request.
Are final record drawings automatically needed before applying for the bond?
The handout requires them before City project acceptance. It does not establish that as a prerequisite to starting the provider application.