Long Beach, CA — Excavation Permit Bond

Long Beach's Public Works packet separates utility excavation from on-site grading, minor right-of-way work and new monitoring wells. Identify the work and the city's actual bond request before choosing security for the permit.

Continue to our secure checkout partner, Propeller (opens in a new tab).

Recorded state
California
Bond type
Excavation Contractor Bond
Category
Contractors & construction

What this bond does

This page is for the excavation-permit bond request for your Long Beach project. The city's current packet assigns utility excavation to Section G and asks for drawings identifying the right-of-way area to be excavated and repaired. The packet explains permit preparation; it does not establish a single bond requirement or undertaking for every Public Works activity.

Who needs it
The project or utility owner and authorized applicant preparing the Public Works request, with the contractor details required before permit issuance. Section A separates owner and applicant and calls for an authorization letter when they differ. Confirm who must be the bond principal rather than assuming the person submitting plans fills that role.
Who it protects
Match security to the city's required excavation and restoration undertaking. The packet separately addresses liability insurance, subdivision performance/labor-and-materials security and monitoring-well deposits; none proves that this excavation bond satisfies those different requirements.

Your bond option

This is the option on record for this bond.

The bond amount describes the limit of the bond obligation, not the price. A listed amount does not establish what the requesting party requires. The premium is what you pay and must be confirmed for the actual option. An E&O limit, where listed, is separate errors and omissions insurance.

Prepare the excavation and repair drawings

For utility work, Section G calls for engineer-stamped/signed civil or excavation drawings, the type of excavation, the applicable restoration standard, potholing exhibits and applicable utility authorization. It also identifies traffic-control and staging information.

On-site grading affecting the right-of-way has a separate Section E, and new monitoring wells have a separate application process. Have Public Works identify the applicable submission and security; do not convert these different permit routes into a claim that one bond covers them all.

Sources

Have these ready

  1. Gather the project/utility owner's legal details, site address, scope and any authorization for a different applicant.
  2. Have the Public Works excavation-security request and the applicable permit/application reference.
  3. Prepare the relevant excavation/repair drawings, utility authorization, traffic/staging information and contractor records.
  4. Confirm the accepted undertaking/provider, principal and legal recipient, required sum/dates and execution, filing and release instructions.

Questions about this bond

Is utility excavation the same application as a new monitoring well?

No. The current Public Works packet assigns utility excavation to Section G but expressly sends new monitoring wells through a separate application process.

Does the Public Works packet set a universal excavation-bond amount?

The material reviewed does not supply the operative excavation bond or a universal sum. Use the city's actual security request, not security figures for another activity.

Where do I start the bond application?

Purchase Now opens Propeller in a new tab. Match the Long Beach excavation request, accepted principal/recipient and form, required sum and dates. Application review, issuance, authorized execution and city filing do not themselves grant permission to excavate or confirm release.