Madison County, OH — Right Of Way Permit Bond
Madison County's utility and broadband packet includes a right-of-way bond and project-based security requirements. Obtain the Engineer's amount and written duration instructions: the packet uses different starting points for its one-year obligations.
Continue to our secure checkout partner, Propeller (opens in a new tab).
- Recorded state
- Ohio
- Bond type
- Right-of-Way / Street Work Bond
- Category
- Contractors & construction
What this bond does
This offering is for a Madison County, Ohio right-of-way permit bond request. The county's utility and broadband packet addresses road work, restoration security and the separate permit process; other work may need different county direction.
- Who needs it
- The utility applicant or installing contractor preparing covered Madison County road-right-of-way work, with the correct principal confirmed by the County Engineer.
- Who it protects
- The packet's bond condition addresses lawful entry, pavement restoration, debris removal and defects in work and affected facilities. Its aggregate surety obligation is limited to the penal sum, with payments reducing that amount.
Your bond option
This is the option on record for this bond.
- Bond optionPurchase Now (opens in a new tab)Continue to our secure checkout partner, Propeller (opens in a new tab).
The bond amount describes the limit of the bond obligation, not the price. A listed amount does not establish what the requesting party requires. The premium is what you pay and must be confirmed for the actual option. An E&O limit, where listed, is separate errors and omissions insurance.
Sources
Have these ready
- Identify the road, utility applicant, installing contractor and planned work method.
- Obtain the Engineer's amount using length, pavement and aerial/underground details.
- Resolve the effective-date, completion and final-inspection duration provisions in writing.
- Check the issued bond and power of attorney, file the required copy and coordinate notices and final review.
Questions about this bond
Is $5,000 sufficient for every Madison County ROW project?
No. The utility/broadband requirements state a minimum for shorter projects and additional length and work-related provisions. Have the Engineer confirm the required total.
Does the packet give one clear starting date for the bond year?
No. Its application, requirements and bond form use final-inspection approval, completion and effective-date wording respectively. Obtain written confirmation of the accepted condition and duration.
Does the six-month permit period end the bond?
No. The packet separately addresses continuing bond obligations and release. Do not treat permit expiration or closure as automatic release.
What attachment does the bond form require?
The packet says a power of attorney must be attached for the bond to be valid. Check the issued document and required attachment before filing.

