Omaha, NE — Street Excavation Bond

Omaha's published ROW Excavation Surety Bond names the City as recipient and states $20,000 for each permit year. It covers permitted excavation work and a two-year maintenance obligation measured from final inspection. The City's permit and pavement-repair process remains separate from buying or issuing the bond.

Continue to our secure checkout partner, Propeller (opens in a new tab).

Recorded state
Nebraska
Bond type
Right-of-Way / Street Work Bond
Category
Contractors & construction

What this bond does

Secure the principal's obligations for permitted excavations in Omaha public right-of-way, including compliance, public protection and the form's restoration/maintenance undertaking.

Who needs it
The excavator or other principal obtaining Omaha permits for underground connections, construction, repair or other work disturbing public ground.
Who it protects
The City's form covers permit work, safeguarding and restoration/maintenance obligations, including work through agents and subcontractors. It is not a guarantee of every part of the applicant's private construction contract.

Your bond option

This is the option on record for this bond.

The bond amount describes the limit of the bond obligation, not the price. A listed amount does not establish what the requesting party requires. The premium is what you pay and must be confirmed for the actual option. An E&O limit, where listed, is separate errors and omissions insurance.

Match the permit-year bond and continuing obligations

The published bond applies to permits obtained from time to time for work disturbing the surface or subsurface of streets, alleys, boulevards, sidewalks and other public ground. It states $20,000 for each permit year and includes two years of maintenance from final inspection.

Purchase Now retains the Propeller application, whose option specifies no fixed sum or term. Supply the City's accepted form, legal principal, permit-year requirements and dates. The form provides 60 days' written notice to the City for surety cancellation of future liability; it does not erase obligations for earlier work.

Coordinate the permit, work zone and City pavement repair

Apply for the ROW Excavation Permit through the City's Accela route. Public Works says a ROW inspector meets onsite before the permit is issued. Submit the executed bond as the City directs and obtain actual authorization before starting; purchase alone is not a permit.

Omaha's repair guidance says Public Works replaces removed pavement and the excavator pays the repair cost, with limited exceptions under the City process. Confirm the assigned restoration work with Public Works rather than assuming the bond lets your crew perform every final pavement repair.

Excavation affecting vehicles or pedestrians also needs Road Work Zone Authorization unless another approved permit covers that need. Setup must wait for approval. Keep permit-year security and the bond's final-inspection-based maintenance obligation distinct from those traffic-control approvals.

Sources

Have these ready

  1. Principal's legal name and City's accepted ROW Excavation Surety Bond.
  2. Permit-year sum and dates; particular locations, work scope and final-inspection maintenance obligation.
  3. Accela excavation application, accepted bond filing and onsite ROW inspection.
  4. Public Works pavement-repair arrangements and any separate work-zone authorization.

Questions about this bond

Is this a separate bond for each excavation?

The published form covers permits obtained from time to time and states $20,000 for each permit year. Confirm the City's accepted permit-year arrangement rather than assuming one bond amount for each cut.

Can my crew replace all pavement under the bond?

Not automatically. Omaha says Public Works performs pavement replacement under its repair process, with limited exceptions, and the excavator bears the cost. Follow the City's assignment for the job.

Does the two-year obligation begin when I buy the bond?

The form measures its maintenance obligation from final inspection. That is different from the permit year and from the date the issuer executes the bond.