Skip to content

Virginia bonds

Orange County, VA — Erosion And Sediment Control Bond

Orange County's E&S program links bond posting with the land-disturbance permit and approved plan or allowed agreement. Have the site's county/town location and project category ready before applying.

Continue to our secure checkout partner, Propeller (opens in a new tab).

Recorded state
Virginia
Bond type
Grading, Erosion & Stormwater Bond
Category
Contractors & construction

What this bond does

This is security associated with the permitted erosion-and-sediment-control obligation, not general contractor registration. The county administers plan review, land-disturbance bond oversight and E&S inspections for the county and its two towns.

Who needs it
The legal applicant/principal specified in the E&S security request. The Culpeper Soil and Water Conservation District assists plan review; that role alone does not make it the bond recipient. Obtain the exact obligee wording from the accepted form.
Who it protects
The published guidance generally uses 10,000 square feet of cumulative disturbance, reduced to 2,500 within either town or on residentially zoned property. Exemptions and an Agreement-in-Lieu for specified building categories are subject to the Program Administrator; do not treat a small area or an agreement as an automatic bond exemption.

Your bond option

This is the option on record for this bond.

The bond amount describes the limit of the bond obligation, not the price. A listed amount does not establish what the requesting party requires. The premium is what you pay and must be confirmed for the actual option. An E&O limit, where listed, is separate errors and omissions insurance.

An agreement can replace the plan, not necessarily the security

The county says an Agreement-in-Lieu may be allowed for detached single-family dwellings and certain agricultural buildings, while the land-disturbance permit and E&S bond are still required. Confirm the applicable project determination and designated Responsible Land Disturber.

The page separately describes construction-stormwater review. That is not the surety application or a reason to substitute a different stormwater bond. The summary does not provide the full E&S bond form, amount, term or release procedure; obtain those project instructions before issuance.

Sources

Have these ready

  1. Identify county/town location, zoning and cumulative disturbed area.
  2. Have the approved E&S plan or authorized Agreement-in-Lieu.
  3. Confirm the Responsible Land Disturber and actual legal principal/recipient.
  4. Collect the accepted security form, required sum, dates and filing instructions.

Questions about this bond

Does an Agreement-in-Lieu remove the bond requirement?

Not according to the county's published guidance for the stated categories. It says a land-disturbance permit and E&S bond are still required; obtain the administrator's project determination.

Is 10,000 square feet the threshold everywhere?

The guidance gives a lower 2,500-square-foot threshold in either town or on residentially zoned property and notes discretionary exemptions. Site location and zoning matter.

Where do I begin the application?

Use Purchase Now to open Propeller in a new tab. Match the legal principal, accepted obligee wording, E&S project/form, sum and dates. Application, issuance, execution, filing and county permit acceptance are separate steps.

Related bonds

Keep exploring

How can we help you get started?

Choose the quote that fits, and we’ll take it from there.

Have a question? Contact us