Oshkosh, WI — Annual Right Of Way Excavation Bond
Oshkosh's annual excavation license is for repeated excavation work at multiple city ROW locations during a calendar year. It differs from site-specific excavation security and the city's non-excavating annual obstruction license.
- Term
- 1 year
Continue to our secure checkout partner, Propeller (opens in a new tab).
- Recorded state
- Wisconsin
- Bond type
- Right-of-Way / Street Work / Encroachment Bond
- Category
- Contractors & construction
What this bond does
Helps a repeat excavation applicant identify the City of Oshkosh annual license and required security before applying.
- Who needs it
- Contractors or other applicants arranging annual excavation licensing for multiple City of Oshkosh ROW projects.
- Who it protects
- The city describes the annual excavation bond as covering construction under permits issued within the license issuance period. The accepted instrument defines the specific undertaking.
Your bond option
This is the option on record for this bond.
- 1 yearPurchase Now (opens in a new tab)Continue to our secure checkout partner, Propeller (opens in a new tab).
The bond amount describes the limit of the bond obligation, not the price. A listed amount does not establish what the requesting party requires. The premium is what you pay and must be confirmed for the actual option. An E&O limit, where listed, is separate errors and omissions insurance.
Sources
- Oshkosh — ROW License Applications (opens in a new tab)Checked October 23, 2026
Have these ready
- Identify the City rather than Town of Oshkosh and the planned multiple-location excavation work.
- Request the annual excavation instrument, required amount and city license dates.
- Reconcile the offered one-year period with the city's actual calendar-year coverage.
- Arrange executed filing, annual license acceptance, individual permits and closeout/continuation.
Questions about this bond
Does the 200-foot site limit apply to annual excavation licensing?
The city attaches that maximum to its site-specific, single-permit license. It says the annual excavation license does not restrict the construction envelope for an individual site.
Can an obstruction license cover excavation?
The city describes annual obstruction licensing for activity requiring no excavation. Obtain the excavation license and security applicable to digging.
Does the one-year option establish a city renewal deadline?
No. Confirm the actual calendar-year license and bond dates with Public Works; no renewal deadline or cancellation rule is independently verified here.

