Oshkosh, WI — Annual Street And Sidewalk Obstruction Bond

For an Oshkosh street or sidewalk obstruction request, identify what will occupy the travel space and how access will be maintained. The city's current category is Annual Obstruction, for work without excavation; confirm this separately named offering supplies its accepted instrument.

Term
1 year

Continue to our secure checkout partner, Propeller (opens in a new tab).

Recorded state
Wisconsin
Bond type
Right-of-Way / Street Work Bond
Category
Contractors & construction

What this bond does

Helps an applicant match street/sidewalk placement and pedestrian-access details to Oshkosh's actual annual obstruction request.

Who needs it
Applicants asked for annual street or sidewalk obstruction security in the City of Oshkosh.
Who it protects
The accepted city form defines the undertaking. Neither this catalog label nor the separate Annual ROW Obstruction label establishes their issued-form equivalence.

Your bond option

This is the option on record for this bond.

The bond amount describes the limit of the bond obligation, not the price. A listed amount does not establish what the requesting party requires. The premium is what you pay and must be confirmed for the actual option. An E&O limit, where listed, is separate errors and omissions insurance.

Describe the occupied street and sidewalk space

Bring the location, equipment/material or container, footprint, duration and proposed vehicle/pedestrian route around the placement. Ask Public Works which permissions and traffic-control arrangements apply to that actual use.

The official annual obstruction category concerns impaired or restricted movement without excavation. A sidewalk obstruction is not automatically permission to remove or excavate sidewalk; identify any digging as separate work.

Resolve the current instrument and separate offering

The city links an Annual Obstruction License packet, while this provider option uses Street and Sidewalk Obstruction. A separate Annual ROW Obstruction option has its own purchase destination. Confirm the required instrument and whether either offering is accepted before treating them as substitutes.

This option is recorded as one year. Get the city-approved amount, principal, recipient wording and dates; do not convert that duration into a verified calendar deadline or assume every placement is covered.

File the issued document before placement

The current city packet's viewer did not provide readable instrument text during review. Obtain the accepted form and confirm its match before using the existing Propeller Street and Sidewalk application.

Submit the executed security as directed, obtain the required license and placement authorization, and follow access/traffic-control conditions. Arrange removal, restoration acceptance and actual security release rather than assuming the last placement day ends the bond.

Sources

Have these ready

  1. Identify the actual City street/sidewalk location and placement footprint.
  2. Separate non-digging occupation from excavation or sidewalk removal.
  3. Resolve the current Annual Obstruction form and the two separately named provider options.
  4. Confirm amount/dates, executed filing, placement permission and removal/release.

Questions about this bond

Is sidewalk removal just an obstruction?

Not if it involves excavation. The city's annual obstruction description is expressly non-excavating; confirm the separate excavation route.

Is this the same as the Annual ROW Obstruction offering?

The catalog has separate options and destinations. Obtain the actual city instrument and provider confirmation before assuming equivalence.

Does one year mean all placements are authorized?

No. Confirm the covered license period and each placement's required permission. Buying security does not authorize occupation.