Oshkosh, WI — Single-Site Right Of Way Excavation Bond
Oshkosh assigns its site-specific excavation license and bond to one work site and one ROW permit, with a maximum disturbance of 200 continuous feet. It is different from annual multi-location excavation security and non-excavating obstruction licensing.
Continue to our secure checkout partner, Propeller (opens in a new tab).
- Recorded state
- Wisconsin
- Bond type
- Right-of-Way / Street Work Bond
- Category
- Contractors & construction
What this bond does
Helps a limited-work applicant identify the City of Oshkosh single-site excavation obligation and actual instrument.
- Who needs it
- Applicants arranging a site-specific excavation license for limited City of Oshkosh ROW work.
- Who it protects
- The city describes the site-specific license and bond as valid only for work approved under a single ROW permit. The accepted form defines the secured undertaking.
Your bond option
This is the option on record for this bond.
- Bond optionPurchase Now (opens in a new tab)Continue to our secure checkout partner, Propeller (opens in a new tab).
The bond amount describes the limit of the bond obligation, not the price. A listed amount does not establish what the requesting party requires. The premium is what you pay and must be confirmed for the actual option. An E&O limit, where listed, is separate errors and omissions insurance.
Sources
- Oshkosh — Site-Specific and Annual ROW Licenses (opens in a new tab)Checked October 23, 2026
Have these ready
- Identify City authority, site, excavation method and continuous disturbance length.
- Check the one-permit/200-continuous-foot category with Public Works.
- Obtain the site-specific form, amount, parties and dates.
- Confirm provider match, executed filing, site authorization and restoration/release.
Questions about this bond
Can one single-site bond cover several locations?
The city assigns this license/bond to an individual site and a single ROW permit. Ask for the appropriate annual route if work involves repeated locations.
What is the stated disturbance limit?
The official page specifies a maximum of 200 continuous feet for site-specific excavation licensing. Confirm that the proposed work fits.
Is a one-year bond period verified here?
No. This option supplies no verified period. Obtain the accepted site-specific instrument and actual dates rather than borrowing the annual offering's duration.

