Pleasant Grove, UT — Right Of Way Permit Bond
Pleasant Grove's linked Street Excavation Permit form calls for a $10,000 surety bond for two years. Prepare it for the contractor and identified trenching, boring or other listed ROW work, and confirm the applicable form version and permit dates with Engineering before issuance.
Continue to our secure checkout partner, Propeller (opens in a new tab).
- Recorded state
- Utah
- Bond type
- Right-of-Way / Street Work Bond
- Category
- Contractors & construction
What this bond does
Addresses Pleasant Grove's surety requirement accompanying a street excavation permit for the identified contractor and ROW work.
- Who needs it
- Contractors arranging a Pleasant Grove street excavation permit for trenching, boring or the listed ROW improvements.
- Who it protects
- The city permit requires compliance with its construction standards and approved plans. The accepted surety form defines the financial security; its two-year requirement is separate from the work permit and liability insurance.
Your bond option
This is the option on record for this bond.
- Bond optionPurchase Now (opens in a new tab)Continue to our secure checkout partner, Propeller (opens in a new tab).
The bond amount describes the limit of the bond obligation, not the price. A listed amount does not establish what the requesting party requires. The premium is what you pay and must be confirmed for the actual option. An E&O limit, where listed, is separate errors and omissions insurance.
Sources
- Pleasant Grove Community Development Department (opens in a new tab)Checked October 18, 2026
- Pleasant Grove — Linked Street Excavation Permit Form (2027 filename) (opens in a new tab)Checked October 23, 2026
Have these ready
- Identify the legal contractor, subcontractor, project and excavation location.
- Confirm the applicable form version, bond recipient, $10,000 amount and required two-year coverage dates.
- Prepare the license, liability certificate, traffic control, drawings and material submittals.
- Resolve the permit-duration discrepancy with Engineering and arrange approval, inspection and closure permissions.
Questions about this bond
What bond does the linked street-excavation form request?
The city's linked street-excavation form lists a $10,000 surety bond for two years. Its filename is marked 2027, so confirm the applicable version, dates and accepted instrument with Engineering before issuance.
Is the excavation permit valid for two years?
No. The linked form has a two-year bond requirement, but its permit-expiration text and fee-table duration differ. Ask Engineering to confirm the applicable work period rather than treating either as the bond term.
What else belongs in the application?
The form asks for the contractor's license, an ACORD liability certificate, traffic control plan, applicable drawings and material submittals. It specifies an E100 license to work in ROW; have the city confirm eligibility for the actual work.
How do I purchase this offering?
Confirm the applicable city form, principal, amount and dates, then use the existing Propeller Purchase Now option. Submit the issued document with the permit file as directed; obtain city approval and signature before starting.

