Pleasant Grove, UT — Right Of Way Permit Bond

Pleasant Grove's linked Street Excavation Permit form calls for a $10,000 surety bond for two years. Prepare it for the contractor and identified trenching, boring or other listed ROW work, and confirm the applicable form version and permit dates with Engineering before issuance.

Continue to our secure checkout partner, Propeller (opens in a new tab).

Recorded state
Utah
Bond type
Right-of-Way / Street Work Bond
Category
Contractors & construction

What this bond does

Addresses Pleasant Grove's surety requirement accompanying a street excavation permit for the identified contractor and ROW work.

Who needs it
Contractors arranging a Pleasant Grove street excavation permit for trenching, boring or the listed ROW improvements.
Who it protects
The city permit requires compliance with its construction standards and approved plans. The accepted surety form defines the financial security; its two-year requirement is separate from the work permit and liability insurance.

Your bond option

This is the option on record for this bond.

The bond amount describes the limit of the bond obligation, not the price. A listed amount does not establish what the requesting party requires. The premium is what you pay and must be confirmed for the actual option. An E&O limit, where listed, is separate errors and omissions insurance.

Prepare the street-excavation file

The linked form distinguishes trenching from boring and records the project, excavation location, contractor and subcontractor. It lists utility work as well as curb, sidewalk, driveway and irrigation work; describe the actual disturbance rather than using a general building-permit description.

Its checklist calls for a $10,000 surety bond for two years, contractor license, ACORD liability certificate, traffic control plan and material submittals. The form specifies E100 to work in ROW and requires city approval of applicable improvement drawings and cut sheets.

Confirm the applicable version and work period

The city currently links a file whose name is marked 2027. Its conditions say the permit expires within 30 days of receipt, while the fee table labels the street excavation permit and extension intervals as six months. Ask Engineering which version and work dates apply; this page does not choose between those conflicting statements.

The two-year surety checklist does not resolve that permit discrepancy. Confirm the bond's required commencement and end dates separately, and do not infer a cancellation or automatic release rule.

Match the request, then purchase

Once Engineering confirms the applicable request, use the existing Propeller Purchase Now option with the correct principal, Pleasant Grove recipient, amount and dates. The linked permit packet directs documents to Row@PGCity.org; follow the city's current submission instructions for the issued instrument and remaining application documents.

The city must approve and sign the permit before work begins, and a copy must remain with the contractor during the work. Arrange the required completion inspection and any separate road-closure permissions. Provider issuance alone does not approve an excavation.

Sources

Have these ready

  1. Identify the legal contractor, subcontractor, project and excavation location.
  2. Confirm the applicable form version, bond recipient, $10,000 amount and required two-year coverage dates.
  3. Prepare the license, liability certificate, traffic control, drawings and material submittals.
  4. Resolve the permit-duration discrepancy with Engineering and arrange approval, inspection and closure permissions.

Questions about this bond

What bond does the linked street-excavation form request?

The city's linked street-excavation form lists a $10,000 surety bond for two years. Its filename is marked 2027, so confirm the applicable version, dates and accepted instrument with Engineering before issuance.

Is the excavation permit valid for two years?

No. The linked form has a two-year bond requirement, but its permit-expiration text and fee-table duration differ. Ask Engineering to confirm the applicable work period rather than treating either as the bond term.

What else belongs in the application?

The form asks for the contractor's license, an ACORD liability certificate, traffic control plan, applicable drawings and material submittals. It specifies an E100 license to work in ROW; have the city confirm eligibility for the actual work.

How do I purchase this offering?

Confirm the applicable city form, principal, amount and dates, then use the existing Propeller Purchase Now option. Submit the issued document with the permit file as directed; obtain city approval and signature before starting.