Portage County, OH — Road Bond
Portage County's Road Bond form concerns vehicle and equipment movements, not permission to excavate. Its special-hauling application requires route approval before the overweight-hauling bond is filed.
Continue to our secure checkout partner, Propeller (opens in a new tab).
- Recorded state
- Ohio
- Bond type
- Right-of-Way / Street Work Bond
- Category
- Contractors & construction
What this bond does
The road bond supports Portage County special-hauling permission on the approved county and township route.
- Who needs it
- The vehicle owner, lessee or responsible hauling applicant seeking the county's covered movement permission.
- Who it protects
- The Road Bond secures approved movements, resulting road/bridge/culvert and related damage, covered fines and penalties and hold-harmless duties. Aggregate surety liability is limited to the stated penal amount.
Your bond option
This is the option on record for this bond.
- Bond optionPurchase Now (opens in a new tab)Continue to our secure checkout partner, Propeller (opens in a new tab).
The bond amount describes the limit of the bond obligation, not the price. A listed amount does not establish what the requesting party requires. The premium is what you pay and must be confirmed for the actual option. An E&O limit, where listed, is separate errors and omissions insurance.
Sources
- Portage County Engineer: Special Hauling Permit Application, revised May 2023 (opens in a new tab)Checked October 23, 2026
- Portage County: Road Bond Example Template (opens in a new tab)Checked October 23, 2026
Have these ready
- Prepare vehicle, axle, load and movement dates.
- Obtain route approval and county/township mileage.
- Confirm the overweight-haul calculation, Board obligee and Road Bond dates.
- Review/file the signed bond and obtain the actual hauling permit and any other road permissions.
Questions about this bond
Does this Road Bond authorize excavation?
No. The posted county form addresses damage from vehicle/equipment movements. An excavation request needs its own authority and instrument.
Is every route bonded at a flat $100,000?
The overweight application specifies $100,000 per mile, prorated in tenths. Obtain route approval and the Engineer's amount first.
Who is named as obligee?
The special-hauling application specifies Portage County Board of Commissioners. Confirm exact completed wording with the Engineer/provider.
Can movement start when the provider issues the bond?
No. File the executed bond and obtain the county permit and any state or city/village permissions applicable to the route.

