Skip to content

Texas bonds

Round Rock, TX — Right Of Way Permit Bond

Round Rock distinguishes the utility provider's $5,000 bond from a standalone street-cut/driveway contractor's $2,000 bond. Identify the applicant's role before using this ROW option; the current utility process does not require another contractor bond when working under the bonded utility provider.

Continue to our secure checkout partner, Propeller (opens in a new tab).

Recorded state
Texas
Bond type
Right-of-Way / Street Work Bond
Category
Contractors & construction

What this bond does

Addresses the required Round Rock permit security for the applicable utility-provider or contractor role, using the city's corresponding form.

Who needs it
Utility providers obtaining Round Rock ROW permits, or applicants confirming whether their separate street-cut/driveway request requires the contractor instrument instead.
Who it protects
The city permit forms secure the stated active permit scope, safeguards and required performance, including correction of covered material/workmanship defects during the bond period.

Your bond option

This is the option on record for this bond.

The bond amount describes the limit of the bond obligation, not the price. A listed amount does not establish what the requesting party requires. The premium is what you pay and must be confirmed for the actual option. An E&O limit, where listed, is separate errors and omissions insurance.

Identify the provider and contractor separately

The current Transportation page requires a registered utility company with insurance and its $5,000 utility bond on file, plus registered contractors/subcontractors with insurance. It says a contractor bond is not separately required in that utility arrangement because the provider is already bonded. Registration does not make the provider and contractor the same principal.

Do not substitute the standalone street-cut form

The city separately lists $2,000 contractor security for standalone street-cut/driveway approach work. The corresponding $5,000 utility and $2,000 contractor forms both refer to active permits and have blank coverage dates, but the amounts and applicant roles differ.

Confirm which instrument the city requests and whether the existing Propeller option matches it. These city arrangements are not two separately populated purchase tiers on this page, and a homeowner exception for work personally performed is not permission to use that route when a contractor does the job.

Maintain security and obtain project approval

The city says utility security is submitted once while it remains active and is renewed as required. That does not establish a fixed annual term for this option. Its current page allows bond/insurance renewals by email without a physical copy; confirm initial execution and submission instructions separately.

Use the city's portal for the applicable registration and project permit with plans, traffic control and company contacts. City infrastructure in an easement outside city limits can still require city review. Bond purchase is not that permit approval.

Sources

Have these ready

  1. Identify utility provider versus contractor and the work's permit category.
  2. Confirm the $5,000 utility or separate $2,000 contractor instrument.
  3. Prepare the named principal, active-permit scope, dates and separate insurance.
  4. Submit the issued security and registration/project materials; maintain active coverage and any required renewals.

Questions about this bond

Must every contractor working for a bonded utility buy another bond?

The city's current utility ROW guidance says a separate contractor bond is not required in that arrangement because the utility provider is bonded. Contractors still need the applicable registration and insurance.

Is the $2,000 street-cut form interchangeable with the utility form?

Do not assume so. Round Rock publishes distinct $2,000 contractor and $5,000 utility forms for different roles. Match the actual request before issuance.

Does submitted once mean no renewal is ever needed?

No. The city qualifies that instruction by requiring security to remain active and be renewed as required. The actual form's dates and city instructions control.

Related bonds

Keep exploring

How can we help you get started?

Choose the quote that fits, and we’ll take it from there.

Have a question? Contact us