San Antonio, TX — Right Of Way Bond

San Antonio lists $100,000 performance security for unlimited permits during the bond period or $10,000 per permit address. Match the required arrangement to your city ROW registration and intended work; this page provides one RLI application route, not two separate checkout packages.

Also known as San Antonio Right Of Way Bonds

Continue to our secure checkout partner, RLI (opens in a new tab).

Recorded state
Texas
Bond type
Right-of-Way / Street Work Bond
Category
Contractors & construction

What this bond does

The right-of-way bond functions as a performance guarantee for the City of San Antonio, ensuring that work within city-controlled infrastructure is executed according to established ordinances, construction criteria, and safety standards.

Who needs it
Construction contractors, utility companies, and service providers planning to perform work within the City of San Antonio's right-of-way infrastructure.
Who it protects
This bond protects the City of San Antonio by providing financial recourse should a contractor fail to restore or maintain infrastructure in accordance with the city's construction guidelines and right-of-way ordinances.

Your bond option

This is the option on record for this bond.

The bond amount describes the limit of the bond obligation, not the price. A listed amount does not establish what the requesting party requires. The premium is what you pay and must be confirmed for the actual option. An E&O limit, where listed, is separate errors and omissions insurance.

Understanding Bond Amount Options

The City of San Antonio distinguishes between two primary performance bond amounts based on the scale of your intended work. Contractors may select a 100,000 dollar bond, which provides coverage for an unlimited number of permits throughout the duration of the bond term.

Alternatively, contractors may choose a 10,000 dollar bond amount, which is specifically applied on a per-permit address basis. Applicants must determine the volume of work and frequency of permitting to select the option that best fits their operational needs.

Registration and Regulatory Compliance

Securing a bond is a mandatory component of the company registration process required by the City of San Antonio Public Works Department. Before you can request a permit, you must be registered through the Right of Way Management System and demonstrate that your company meets all city-mandated bonding and insurance thresholds.

In addition to the bond, companies must provide evidence of sufficient insurance, including at least 5 million dollars in general liability and umbrella aggregate coverage, 1 million dollars in auto liability, and 1 million dollars in workers compensation coverage.

Permit Application and Ongoing Obligations

After registering your company and providing proof of the required bond, you may submit permit requests through the city's online portal. Excavation projects of 50 linear feet or more require submission at least 30 days prior to the start of work, along with project plans and a project information form.

Failure to adhere to these guidelines or improper backfilling may result in daily violation fees of 600 dollars. Follow the Utility Excavation Criteria Manual and the accepted bond's continuing duties; successful completion alone is not evidence of automatic bond release.

Use the existing RLI option with the required city amount and arrangement. After issuance, provide the required bond documentation for city registration review, then obtain the applicable project permit. Bond application or payment does not complete registration or authorize work.

Sources

Have these ready

  1. Verify your company registration status in the City of San Antonio Right of Way Management system.
  2. Calculate the anticipated permit volume to choose between the 100,000 dollar unlimited or 10,000 dollar per-permit bond option.
  3. Prepare all required insurance documentation, including evidence of general liability, auto, and workers compensation coverage.
  4. For planned excavation of 50 linear feet or more, submit project plans and the Project Information Form at least 30 days before work starts.

Questions about this bond

What is the difference between the 100,000 dollar and 10,000 dollar bond?

The 100,000 dollar bond covers an unlimited number of permits for the duration of the bond, while the 10,000 dollar bond is applied specifically to a single permit address.

Is the bond sufficient to cover all city requirements?

No, the bond is only one part of the requirement; you must also provide proof of insurance coverage, including general liability, auto, and workers compensation, and register your company annually for a 45 dollar fee.

Can I apply for a permit immediately after obtaining my bond?

You must first ensure your company is registered in the City's Right of Way Management System and that all documentation, including your bond and insurance, has been verified by the city.

What happens if I receive a violation during my project?

If you do not meet the city's infrastructure guidelines, inspectors may assess a fee of 600 dollars per day per violation until the work is corrected to meet municipal standards.

Related bonds

Keep exploring

How can we help you get started?

Choose the quote that fits, and we’ll take it from there.

Have a question? Contact us