Skip to content

Washington bonds

Seattle, WA — Public Place Ordinance Bond

Match Seattle's Public Place Ordinance offering to the particular ordinance, permit and city-accepted bond form before applying. If the request concerns a Council Term structure, its ordinance conditions matter; an ordinary street-improvement bond is not automatically the same instrument.

Continue to our secure checkout partner, Propeller (opens in a new tab).

Recorded state
Washington
Bond type
Right-of-Way / Street Work / Encroachment Bond
Category
Contractors & construction

What this bond does

Helps applicants identify the exact Seattle ordinance-based public-place undertaking requested for their use or structure.

Who needs it
Applicants with a written Seattle request citing a public-place ordinance and its required bond.
Who it protects
The actual ordinance and accepted bond define the obligation to the city. The catalog label and general permit guides do not establish that this provider offering matches every Council Term or street-use request.

Your bond option

This is the option on record for this bond.

The bond amount describes the limit of the bond obligation, not the price. A listed amount does not establish what the requesting party requires. The premium is what you pay and must be confirmed for the actual option. An E&O limit, where listed, is separate errors and omissions insurance.

Bring the actual ordinance, not only the offering name

Seattle's Council Term guide concerns significant ROW structures such as tunnels, bridges, ramps, plazas, artwork and skybridges. It describes conceptual approval by resolution followed by an ordinance after technical approval; the ordinance specifies the permit's conditions.

If that is your request, provide the ordinance number, named permittee, structure location and accepted security wording. The guide's fifteen-year permit period and possible renewal are permit terms, not evidence of a fifteen-year bond term for this offering.

Do not substitute an ordinary improvement instrument

SDOT publishes a separate bond process for Street Improvement and Utility Major permits: approved estimate, city-provided form and legal review before original filing. That process does not prove that its instrument satisfies a particular public-place ordinance.

This review did not verify the exact ordinance bond form or the match to the existing provider. Obtain the city's required amount, secured duties, dates, continuation and release conditions rather than borrowing them from general street-use or unrelated term-permit examples.

Confirm the match before issuance

Once the city and provider confirm the ordinance-specific instrument, use the existing Propeller Purchase Now option with the correct legal principal and references. Follow that case's execution and filing instructions, including any required city legal review.

Provider issuance does not grant an ordinance, approve a structure or authorize construction. Complete the applicable city approval and permit steps and retain any ongoing inspection, ownership-change or removal requirements in the actual grant.

Sources

Have these ready

  1. Obtain the actual ordinance/permit request, legal permittee and structure/use location.
  2. Confirm whether the request is Council Term or another specifically identified city undertaking.
  3. Obtain the exact bond form, amount, duties, dates and provider match.
  4. Follow case-specific execution, legal review, filing, permit approval and ongoing conditions.

Questions about this bond

Is every Public Place Ordinance offering a Council Term bond?

That equivalence is not verified here. If your request cites Council Term approval, bring the actual ordinance and have the city and provider confirm the required instrument.

Does a fifteen-year permit establish the bond term?

No. The Council Term guide describes the permission period. The actual ordinance and bond establish the required security duration.

Can I use the ordinary SIP bond instead?

Do not assume so. SDOT's SIP/Utility Major guide describes a separate city-form process; a particular ordinance may require a different undertaking.

What remains unconfirmed?

The exact ordinance-specific bond and this offering's match, including amount, secured duties, coverage and release. Obtain those instructions before provider issuance.

Related bonds

Keep exploring

How can we help you get started?

Choose the quote that fits, and we’ll take it from there.

Have a question? Contact us