Skip to content

Kansas bonds

Shawnee, KS — Low Impact Land Disturbance Permit Bond

Shawnee distinguishes low-impact land-disturbance permits from standard development and general-utility permits. This listing is for the low-impact request; being under one acre does not, by itself, establish that no permit or security is needed.

Continue to our secure checkout partner, Propeller (opens in a new tab).

Recorded state
Kansas
Bond type
Grading, Erosion & Stormwater Bond
Category
Contractors & construction

What this bond does

The city's published guidelines connect land-disturbance security with maintaining erosion and sediment controls and removing mud from public rights-of-way. They also describe a separate low-impact process for certain smaller grading and residential projects. Match the actual low-impact security request rather than assuming every standard-permit provision applies unchanged.

Who needs it
The owner/developer or authorized applicant required by the city's accepted security instructions. A qualified erosion-control specialist, construction-site operator and owner are distinct roles in the published materials and should not automatically be interchanged on the bond.
Who it protects
The requested performance/maintenance undertaking supports the erosion-control obligation stated in the accepted form. It is not general liability coverage, a public-improvement bond for every city project or authorization to work in the right-of-way.

Your bond option

This is the option on record for this bond.

The bond amount describes the limit of the bond obligation, not the price. A listed amount does not establish what the requesting party requires. The premium is what you pay and must be confirmed for the actual option. An E&O limit, where listed, is separate errors and omissions insurance.

Use the low-impact packet and the city's required security

The guidelines describe low-impact review for smaller sites based on the work, including cut/fill, roofed structures and proximity to drainage ways, and a residential low-impact process associated with building permits. They direct applicants to the appropriate city office and distinguish general-utility work. Get the permit classification for your actual site.

The same document's standard-permit discussion describes a performance/maintenance guarantee and a minimum sum. Do not apply that minimum automatically to this low-impact listing: obtain the city's required form and amount. Work in public rights-of-way also needs its separate permission, and a bond application does not provide it.

Sources

Have these ready

  1. Identify the low-impact or residential low-impact permit request, site and legal applicant.
  2. Have the site plan, proposed disturbed area, cut/fill quantities and proximity to drainage ways.
  3. Gather the erosion-control requirements and the city's written low-impact security instructions.
  4. Confirm the principal/recipient, accepted performance/maintenance form, required sum/dates and execution/filing steps before issuance.

Questions about this bond

Does a site smaller than an acre avoid all land-disturbance requirements?

The guidelines describe low-impact permits for certain smaller disturbances and residential work. The type and location of the activity matter; obtain the city's classification.

Can I use a public-improvement bond just because it names Shawnee?

Do not assume so. The obligation and permit classification must match the low-impact request, not simply the city's name.

How do I apply for this option?

Purchase Now opens Propeller in a new tab. Match the Shawnee low-impact request, legal principal, accepted form/recipient, required sum and dates. Provider review and issuance precede execution and city filing; they do not issue the land-disturbance or right-of-way permit.

Related bonds

Keep exploring

How can we help you get started?

Choose the quote that fits, and we’ll take it from there.

Have a question? Contact us