Tennessee — Running Occupancy Right Of Way Bond
A TDOT running utility bond can cover approved Use and Occupancy Agreements within a specified area. Confirm that area and the Regional Utilities Engineer’s required sum; “running” does not grant permission for every future installation.
Continue to our secure checkout partner, Propeller (opens in a new tab).
- Recorded state
- Tennessee
- Bond type
- Right-of-Way / Street Work / Encroachment Bond
- Category
- Contractors & construction
What this bond does
Provide TDOT-accepted continuing security for the approved utility use-and-occupancy arrangements identified in the request.
- Who needs it
- Utility owners with multiple approved highway-right-of-way installations in an agreed area.
- Who it protects
- The rules require security for performance of use-and-occupancy conditions, including applicable restoration duties. This is different from a driveway entrance construction bond or a general state construction-contract payment/performance bond.
Your bond option
This is the option on record for this bond.
- Bond optionPurchase Now (opens in a new tab)Continue to our secure checkout partner, Propeller (opens in a new tab).
The bond amount describes the limit of the bond obligation, not the price. A listed amount does not establish what the requesting party requires. The premium is what you pay and must be confirmed for the actual option. An E&O limit, where listed, is separate errors and omissions insurance.
Sources
- Tennessee — Utility Accommodation Rules, Chapter 1680-6-1 (opens in a new tab)Checked October 23, 2026
Have these ready
- Utility owner’s legal name, Regional Utilities Engineer request and current running form.
- Specified geographic area and approved use/occupancy agreements, routes and installations.
- Assigned sum, dates, power of attorney and filing/maintenance-release instructions.
Questions about this bond
Does running security approve future installations?
No. The rule refers to approved agreements within a specified area; each installation still needs the applicable approval.
Is $2,500 the verified running-bond amount?
No. That minimum appears with the separate Form U-5 procedure. Obtain the Engineer’s assigned running-bond sum.
Is this the driveway entrance bond?
No. Match the utility use-and-occupancy request rather than substituting a state-highway driveway instrument.