Terre Haute, IN — Contractor License For Work In Right-Of-Way Bond — $25,000
Terre Haute requires its $25,000 City bond form for contractors working in the ROW instead of the ordinary $10,000 form. The 2026 standards allow additional security for larger disturbed areas; contractor registration, accepted bond filing and the actual ROW work permit remain separate.
Also known as Terre Contractor Bonds; Terre Haute, IN Contractor License for Work in Right-of-Way Bond
Continue to our secure checkout partner, RLI (opens in a new tab).
- Recorded state
- Indiana
- Bond type
- Right-of-Way / Street Work Bond
- Category
- Contractors & construction
What this bond does
City-required contractor license/permit security for Terre Haute ROW work under the actual registration and Engineering request.
- Who needs it
- The legal contractor/principal seeking the City license/registration and covered ROW work permission, not a substitute for separately required trade qualifications.
- Who it protects
- The posted form addresses losses from license/permit noncompliance during its term, with City/third-party beneficiary wording and an aggregate surety limit. It does not automatically guarantee every private project's completion or payment.
Your bond option
This is the option on record for this bond.
- Bond optionPurchase Now (opens in a new tab)Continue to our secure checkout partner, RLI (opens in a new tab).
The bond amount describes the limit of the bond obligation, not the price. A listed amount does not establish what the requesting party requires. The premium is what you pay and must be confirmed for the actual option. An E&O limit, where listed, is separate errors and omissions insurance.
Sources
- Terre Haute: current License Information (opens in a new tab)Checked October 22, 2026
- Terre Haute Engineering: current Forms and Information (opens in a new tab)Checked October 22, 2026
- Terre Haute: posted $25,000 contractor license/permit bond (opens in a new tab)Checked October 22, 2026
- Terre Haute 2026 Standards: complete relevant 1.1–1.5 (opens in a new tab)Checked October 22, 2026
Have these ready
- Legal contractor/principal, actual City ROW work/location and disturbed-area/restoration information.
- Engineering's $25,000 baseline or assigned additional sum, mandatory City form and exact beneficiary/term wording.
- Executed original/Cityworks acceptance, separate required insurance and actual registration qualifications.
- Approved ROW permit, activation/closure arrangements, inspection and post-work/continuation or release records.
Questions about this bond
Must I buy both $10,000 and $25,000 forms by default?
The current City page says $25,000 instead of $10,000 for ROW work. Match the actual request and any additional security Engineering assigns.
Is the source-title amount necessarily sufficient for a large cut?
The 2026 standards allow additional bonding for more than 1,000 square feet of disturbance based on restoration cost. Obtain the actual City requirement.
Does the 90-day permit window mean a 90-day bond?
No. It is the work-permit activation window. Registration, issued bond dates, five-working-day activated work and post-inspection obligations are distinct.

